Retaining wall cost in Maryland

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (200 sq ft of wall face)
$7,050 – $13,600
Per sq ft of wall face
$35 – $65.50
before permit
Versus US midpoint
Level
US $10,300
Metros covered
3

Across Maryland, a retaining wall costs about $7,050 to $13,600 for 200 sq ft of wall face. Statewide, that midpoint is 0% above the US figure of $10,300. Brickmasons and blockmasons earn a median $28.38 an hour in Maryland (US: $29.87).

Inside Maryland, the metros we cover range from $9,550 (Hagerstown) to $10,200 (Baltimore) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your retaining wall cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard segmental block wall with drainage

Estimated cost for 200 sq ft of wall face in Maryland (statewide), standard level

$9,000 to $11,600

About $44 to $56.50 per sq ft of wall face before permits. Labor is about 45% of the bill.

Cost breakdown
PartLowHigh
Materials$4,400$6,450
Labor$4,400$4,800
Permits and fees$180$350
Total$9,000$11,600
Save and get a PDF report

Cost breakdown for 200 sq ft of wall face in Maryland

Part of the jobLowMidpointHighShare
Materials$2,850$5,450$8,00053%
Labor$4,100$4,600$5,10045%
Permits and fees$50$260$4703%
Total$7,050$10,300$13,600100%

If you are planning more than one job in Maryland

Each project weights the trades differently, so Maryland's wage level does not push every price by the same amount. Compared with the US midpoint, French drain is +3% and concrete driveway −2%.

Related projects with local prices
ProjectSizeRangevs. US
French drain60 linear ft$620 – $2,150+3%
Paver patio300 sq ft$3,000 – $5,450level
Concrete driveway600 sq ft$3,600 – $9,000−2%
Sod installation1,500 sq ft$1,500 – $3,350+2%
Sprinkler system4,000 sq ft of lawn$4,100 – $10,200+2%
Inground pool450 sq ft$36,500 – $114,000+1%

Why two Maryland quotes can differ

  • Height

    Walls over 4 feet need engineering, deeper excavation and more skilled labor; many cities require permits over 3-4 feet (HomeGuide).

  • Material

    Block, poured concrete and natural stone are priced differently; concrete and stone walls run higher than the segmental block default.

  • Drainage

    Every wall needs drainage behind it. A French drain adds $10-$85+ per linear foot.

  • Rebuilding

    Replacing an old wall adds $15-$30 per linear foot for demolition plus disposal.

  • Permit

    Permits cost $50-$450 depending on location and wall size.

What brickmasons and blockmasons and the other trades earn in Maryland

Maryland's labor line is priced from 3 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 0.98 times the national level.

For brickmasons and blockmasons (47-2021, weighted 50%) the local median is $28.38 an hour, which is 5% below the national $29.87. The middle half of them earn between $22.59 and $30.00 an hour. BLS counts 1,650 of them working in the state, 6.0 for every 10,000 jobs (US: 3.4), so the local bench is deeper than average.

For construction laborers (47-2061, weighted 30%) the local median is $22.58 an hour, which is in line with the national $22.66. The middle half of them earn between $18.98 and $26.70 an hour. BLS counts 20,920 of them working in the state, 75.7 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 20% of the weighting: a median of $29.53 an hour, in line with the US median of $28.78. The middle half of them earn between $23.76 and $34.07 an hour. About 6,610 work in the state. That is 23.9 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A crew paid at the 75th percentile for brickmasons and blockmasons ($30.00 an hour) would add about $130 to the statewide midpoint; one at the 25th percentile ($22.59) would take off about $460. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 2,763,030 jobs across Maryland (May 2025), which is 1.8% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Brickmasons and blockmasons (47-2021)50%$22.59$28.38$30.00$29.870.95state
Construction laborers (47-2061)30%$18.98$22.58$26.70$22.661.00state
Operating engineers and other construction equipment operators (47-2073)20%$23.76$29.53$34.07$28.781.03state
Blended100%0.98

Maryland versus the states around it

Maryland ranks 22 of 51 (the 50 states plus DC) for retaining wall, where 1 is the most expensive. The costliest is Hawaii at $13,300 and the cheapest New Mexico at $9,000, both for 200 sq ft of wall face at the midpoint. Maryland sits at $10,300. The five states closest by workforce center are listed below.

States near Maryland, same project and size
StateDistanceRangeMidpointvs. here
District of Columbia50 miles away$7,600 – $14,500$11,000+7%
Delaware60 miles away$7,000 – $13,300$10,100−2%
Pennsylvania70 miles away$7,350 – $13,800$10,600+3%
New Jersey110 miles away$8,650 – $15,700$12,200+18%
Virginia150 miles away$6,700 – $13,000$9,850−4%

Basic, standard or premium: Maryland prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from short garden wall (4x25 ft), 100 sq ft of wall face to 40 ft x 6 ft (240 sq ft of wall face).

Basic

$7,050 to $9,650

Short block wall, easy access

Standard

$9,000 to $11,600

Standard segmental block wall with drainage

Premium

$11,000 to $13,600

Tall or stone wall, engineered, hard access

Cost by size and quality level
SizeBasicStandardPremium
short garden wall (4x25 ft), 100 sq ft of wall face$3,550 – $4,950$4,600 – $5,950$5,650 – $7,000
20 ft x 4 ft (80 sq ft of wall face)$2,850 – $4,000$3,700 – $4,850$4,550 – $5,700
40 ft x 4 ft (160 sq ft of wall face)$5,650 – $7,750$7,250 – $9,350$8,800 – $10,900
40 ft x 6 ft (240 sq ft of wall face)$8,450 – $11,500$10,800 – $13,900$13,100 – $16,200

Retaining wall cost by metro in Maryland

0 of the 3 metros sit above the statewide midpoint of $10,300, and the top-to-bottom gap is 7%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (200 sq ft of wall face)Midpointvs. state
Baltimore, MD$6,950 – $13,500$10,200−1%
Lexington Park, MD$6,900 – $13,300$10,100−2%
Hagerstown, MD$6,500 – $12,600$9,550−7%

When Maryland weather lets you build

Weather decides when digging and ground work can happen, and Maryland is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Lexington Park has the longest comfortable season of the metros we cover in Maryland at 10 months (March through December); Hagerstown has the shortest at 8 (April through November). Rainfall runs from 44 inches a year in Hagerstown to 45 inches in Lexington Park.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Baltimore3090449: March through June and August through December
Hagerstown2286448: April through November
Lexington Park30874510: March through December

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $9,000 to $11,600 for Maryland is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Maryland: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Retaining wall in Maryland: your questions

+How much does it cost to build a retaining wall in Maryland?

$7,050 to $13,600 for 200 sq ft of wall face, using statewide wages and prices. Metro areas inside Maryland can sit above or below that.

+Which city in Maryland is cheapest for retaining wall?

Hagerstown at about $9,550 (midpoint, 200 sq ft of wall face). The priciest is Baltimore at $10,200.

+Is retaining wall cheaper in Maryland than the US average?

It is 0% more expensive: $10,300 against $10,300 for 200 sq ft of wall face at the midpoint.

+What share of the price is labor in Maryland?

About 45% ($4,600). Materials are 53%. Statewide labor for this job is weighted 0.98x the national wage level.

+What do brickmasons and blockmasons earn in Maryland?

The BLS statewide median is $28.38 an hour, against $29.87 for the US. The 25th to 75th percentile range is $22.59 to $30.00.

+Where does Maryland rank for retaining wall costs?

22nd most expensive of 51 (the 50 states plus DC) at the midpoint, $10,300 for 200 sq ft of wall face. Rank 1 is the costliest.

+What do basic and premium retaining wall work cost in Maryland?

For 200 sq ft of wall face, basic work runs $7,050 to $9,650 and premium work $11,000 to $13,600. Basic means: short block wall, easy access. Premium means: tall or stone wall, engineered, hard access.

+Does the season matter for retaining wall in Maryland?

Yes where winters or summers are hard. Of the Maryland metros we cover, Lexington Park has the most comfortable months (10 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

Retaining wall by city in Maryland

Retaining wall: all pricesMaryland cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 40% of the low installed price and 60% of the high one, since HomeGuide says labor is 40-60% of the total project cost.