Paver patio cost in Charlottesville, VA
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (300 sq ft)
- $2,850 – $5,150
- Per sq ft
- $9.45 – $16
- before permit
- Versus US midpoint
- −6%
- US $4,250
- Rank of 300 metros
- #194
- 1 = most expensive
Charlottesville homeowners pay roughly $2,850 to $5,150 to install a paver patio at 300 sq ft, or $9.45 to $16 per sq ft (permit not included). Against the US midpoint, Charlottesville is 6% lower. Construction laborers earn a median of $21.67 an hour in the Charlottesville area, 4% below the US median of $22.66.
Estimate your paver patio cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 300 sq ft in Charlottesville, VA, standard level
$3,500 to $4,450
About $11.50 to $14 per sq ft before permits. Labor is about 59% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,350 | $1,550 |
| Labor | $2,100 | $2,650 |
| Permits and fees | $100 | $240 |
| Total | $3,500 | $4,450 |
Cost breakdown for 300 sq ft in Charlottesville, VA
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,150 | $1,450 | $1,750 | 36% |
| Labor | $1,650 | $2,350 | $3,050 | 59% |
| Permits and fees | $0 | $170 | $350 | 4% |
| Total | $2,850 | $4,000 | $5,150 | 100% |
Why Charlottesville prices look the way they do
We price the labor side from BLS wage data for 3 trades: construction laborers at 50%, brickmasons and blockmasons at 30%, landscaping and groundskeeping workers at 20%. Weighted together, Charlottesville wages are 0.93 times the national level. Labor makes up about 59% of the midpoint estimate (60% at national prices).
On the materials line, the BEA goods price index for the Charlottesville metro is 96.8 (US = 100). The midpoint materials bill for 300 sq ft comes to $1,450, compared with $1,500 at national prices. Permit and inspection fees are scaled by the broader index (99.1) and land at $0 to $350.
Specs and site conditions that change a Charlottesville bid
Excavation and grading
Digging out is $1-$5 per sq ft; regrading a sloped yard is $0.40-$2.00 per sq ft.
Pattern
Herringbone and curves take longer to lay and waste more stone than a running bond.
Permit
At-grade patios often need no permit; add a retaining wall, a cover, or a connection to the house and that changes.
Cost by quality level and size in Charlottesville
Three bands are cut from the same cited range and localized for Charlottesville wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$2,850 to $3,750
Basic concrete pavers, simple pattern, level yard
Standard
$3,500 to $4,450
Mid-grade pavers, a border or curve, some regrading
Premium
$4,200 to $5,150
Natural stone or clay brick, complex pattern, slope or retaining edge
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 12x12 (144 sq ft) | $1,350 – $1,850 | $1,750 – $2,250 | $2,150 – $2,650 |
| 16x16 (256 sq ft) | $2,400 – $3,250 | $3,000 – $3,850 | $3,650 – $4,450 |
| 20x20 (400 sq ft) | $3,750 – $4,950 | $4,650 – $5,850 | $5,550 – $6,750 |
| pool deck (800 sq ft) | $7,550 – $9,800 | $9,200 – $11,500 | $10,900 – $13,100 |
When to schedule paver patio in Charlottesville
We use NOAA's 1991-2020 climate normals for Charlottesville 2 Sse (5 miles from the city center). These are 30-year monthly averages, not forecasts.
March through November is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Charlottesville (9 of 12 months). January, February and December have an average overnight low at or below freezing (32°F).
In January, February and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 73 days a year with a low at or below 32°F at this station.
Charlottesville gets about 48 inches of precipitation in a normal year. The wettest months are May, July and September (4.9 inches in September). Inside the workable window, June and November are the driest, at 3.7 and 3.4 inches. The station averages about 10 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 44 | 28 | 3.4 | Cold |
| Feb | 48 | 31 | 3.0 | Cold |
| Mar | 55 | 37 | 4.3 | Workable |
| Apr | 66 | 47 | 4.2 | Workable |
| May | 72 | 55 | 4.6 | Workable |
| Jun | 80 | 64 | 3.7 | Workable |
| Jul | 84 | 68 | 4.8 | Workable |
| Aug | 82 | 66 | 4.1 | Workable |
| Sep | 76 | 61 | 4.9 | Workable |
| Oct | 66 | 50 | 4.0 | Workable |
| Nov | 56 | 40 | 3.4 | Workable |
| Dec | 47 | 32 | 3.8 | Cold |
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Charlottesville is 0.93 times the national level.
Construction laborers (47-2061), 50% of the weighting: a median of $21.67 an hour, 4% below the US median of $22.66. The middle half of them earn between $18.49 and $22.62 an hour. About 570 work in the metro. That is 49.7 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
Brickmasons and blockmasons (47-2021), 30% of the weighting: a median of $25.38 an hour, 15% below the US median of $29.87. The middle half of them earn between $20.76 and $28.22 an hour. About 30 work in the metro. That is 2.6 per 10,000 jobs, compared with 3.4 nationally, so expect fewer local crews to bid.
For landscaping and groundskeeping workers (37-3011, weighted 20%) the local median is $18.20 an hour, which is 3% below the national $18.82. The middle half of them earn between $17.39 and $22.39 an hour. BLS counts 900 of them working in the area, 78.4 for every 10,000 jobs (US: 61.3), so the local bench is deeper than average.
Quotes come from real crews, not medians. If the construction laborers on your job are paid at the 75th percentile ($22.62 an hour) instead of the median, the labor line grows by about $55. At the 25th percentile ($18.49) it shrinks by about $180. The total moves by 1.3% or 4.5%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 114,780 jobs in the Charlottesville area. That makes it the 190th largest of the 300 metros we cover, with 0.07% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Construction laborers (47-2061) | 50% | $18.49 | $21.67 | $22.62 | $22.66 | 0.96 | metro |
| Brickmasons and blockmasons (47-2021) | 30% | $20.76 | $25.38 | $28.22 | $29.87 | 0.85 | metro |
| Landscaping and groundskeeping workers (37-3011) | 20% | $17.39 | $18.20 | $22.39 | $18.82 | 0.97 | metro |
| Blended | 100% | 0.93 | |||||
Planning more than one job in Charlottesville?
Because every project leans on different trades, Charlottesville's wage level does not move all prices equally. Against the US midpoint, concrete slab runs −5% and concrete driveway −6%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,200 – $3,800 | −5% |
| Stamped concrete | 400 sq ft | $3,100 – $7,550 | −5% |
| Retaining wall | 200 sq ft of wall face | $6,600 – $12,700 | −6% |
| Wood deck | 300 sq ft | $7,200 – $14,400 | −5% |
| Concrete slab | 400 sq ft | $2,350 – $4,950 | −5% |
| Concrete driveway | 600 sq ft | $3,450 – $8,650 | −6% |
Optional extras in Charlottesville
Extras are quoted nationally and then scaled to Charlottesville by the average of the local wage index (0.93) and goods index (0.97), a factor of 0.95. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Excavation and haul-away | $280 – $1,400 |
How Charlottesville compares
Of the five closest metros, 4 are cheaper than Charlottesville. Roanoke is the lowest at about $3,700 (midpoint, 300 sq ft), 85 miles away.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Charlottesville, VAthis page | $2,850 – $5,150 | $4,000 | |
| Harrisonburg, VA40 miles | $2,800 – $5,100 | $3,950 | −1% |
| Lynchburg, VA55 miles | $2,650 – $4,850 | $3,750 | −6% |
| Richmond, VA75 miles | $2,750 – $5,000 | $3,900 | −2% |
| Washington, DC85 miles | $3,100 – $5,600 | $4,350 | +9% |
| Roanoke, VA85 miles | $2,650 – $4,750 | $3,700 | −7% |
| Virginia (statewide) | $2,850 – $5,200 | $4,050 | +1% |
| United States | $3,000 – $5,450 | $4,250 | +6% |
Across 300 US metros, Charlottesville comes in at #194 from the top. The priciest is Kahului, HI at $5,650; the cheapest is Dothan, AL at $3,500 (midpoints, 300 sq ft). Statewide, Charlottesville is 1% below the Virginia figure.
Other Virginia metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Virginia Beach, VA | 763,060 jobs | $2,650 – $4,850 | $3,750 | −6% |
| Richmond, VA | 660,350 jobs | $2,750 – $5,000 | $3,900 | −2% |
| Roanoke, VA | 153,980 jobs | $2,650 – $4,750 | $3,700 | −7% |
| Lynchburg, VA | 97,190 jobs | $2,650 – $4,850 | $3,750 | −6% |
| Blacksburg, VA | 74,070 jobs | $2,750 – $5,000 | $3,850 | −3% |
| Winchester, VA | 67,740 jobs | $2,750 – $5,050 | $3,900 | −2% |
Cities with a workforce like Charlottesville's
Big cities and small ones price differently, so here is Charlottesville against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Tyler, TX | 115,220 jobs | $2,650 – $4,850 | $3,750 | −6% |
| Laredo, TX | 109,370 jobs | $2,550 – $4,600 | $3,600 | −10% |
| Topeka, KS | 115,750 jobs | $2,900 – $5,250 | $4,100 | +2% |
| Tuscaloosa, AL | 108,460 jobs | $2,600 – $4,700 | $3,650 | −8% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,500 to $4,450 for Charlottesville, VA is attached.
Detailed paver patio report for Charlottesville, VA, $9
The report lays out the paver patio numbers for Charlottesville, VA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Paver patio in Charlottesville: your questions
+How much does it cost to install a paver patio in Charlottesville?
For 300 sq ft, expect $2,850 to $5,150 in the Charlottesville area. A standard-spec job lands at $3,500 to $4,450. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for paver patio in Charlottesville?
About $9.45 to $16 per sq ft for materials and labor, plus $0 to $350 for the permit if one is needed. The US range is $10 to $17.
+Is paver patio cheaper in Charlottesville or Harrisonburg?
Harrisonburg is 40 miles away. The midpoint for 300 sq ft there is $3,950, which is 1% less than Charlottesville ($4,000). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Charlottesville?
About 59% at the midpoint, or $2,350 out of $4,000. Materials are 36% and permits 4%. Nationally, labor is 60%.
+What would 20x20 (400 sq ft) cost in Charlottesville?
$3,750 to $6,750. Pick a different size in the estimator above to get your own number.
+Does paver patio need a permit in Charlottesville?
Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $350 for fees in the Charlottesville area (our national range of $0 to $350 scaled by the local price level).
+Is Charlottesville expensive for paver patio compared with the rest of Virginia?
Charlottesville is 1% below the Virginia statewide estimate ($4,050 at the midpoint). We cover 8 metros in Virginia; see the state page to compare them.
+What do construction laborers earn in Charlottesville?
The BLS median is $21.67 an hour in the Charlottesville area, compared with $22.66 nationally. The 25th to 75th percentile range is $18.49 to $22.62.
+What do basic and premium paver patio work cost in Charlottesville?
For 300 sq ft, basic work runs $2,850 to $3,750 and premium work $4,200 to $5,150. Basic means: basic concrete pavers, simple pattern, level yard. Premium means: natural stone or clay brick, complex pattern, slope or retaining edge.
+When is the best time to install a paver patio in Charlottesville?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through November. June and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "excavation and haul-away" add in Charlottesville?
$280 to $1,400 for 300 sq ft, from a national range scaled by the local wage and goods indexes.
Paver patio near Charlottesville
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: 2026 Paver Patio Cost | Paver Installation Costs (accessed November 4, 2026)
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020