Hardwood flooring cost in Missouri
Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.
- Statewide range (500 sq ft)
- $5,350 – $12,200
- Per sq ft
- $10.50 – $24.50
- before permit
- Versus US midpoint
- −2%
- US $9,000
- Metros covered
- 6
Across Missouri, a hardwood floor costs about $5,350 to $12,200 for 500 sq ft. Statewide, that midpoint is 2% below the US figure of $9,000. Carpenters earn a median $29.25 an hour in Missouri (US: $29.12).
Inside Missouri, the metros we cover range from $8,150 (Joplin) to $9,750 (St. Louis) at the midpoint. Pick your closest city in the table for a tighter number.
Estimate your hardwood flooring cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 500 sq ft in Missouri (statewide), standard level
$7,400 to $10,100
About $15 to $20.50 per sq ft before permits. Labor is about 42% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $4,200 | $5,900 |
| Labor | $3,250 | $4,200 |
| Permits and fees | $0 | $0 |
| Total | $7,400 | $10,100 |
Cost breakdown for 500 sq ft in Missouri
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $2,900 | $5,050 | $7,200 | 58% |
| Labor | $2,500 | $3,750 | $4,950 | 42% |
| Permits and fees | $0 | $0 | $0 | 0% |
| Total | $5,350 | $8,800 | $12,200 | 100% |
What carpenters and the other trades earn in Missouri
Missouri's labor line is priced from 2 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 0.99 times the national level.
Carpenters (47-2031), 70% of the weighting: a median of $29.25 an hour, in line with the US median of $29.12. The middle half of them earn between $22.85 and $38.74 an hour. About 14,410 work in the state. That is 49.1 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.
Floor layers (except carpet, wood and hard tiles) (47-2042), 30% of the weighting: a median of $26.30 an hour, 3% below the US median of $27.15. The middle half of them earn between $20.32 and $35.80 an hour. About 590 work in the state. That is 2.0 per 10,000 jobs, compared with 1.5 nationally, which suggests plenty of local crews to bid.
A crew paid at the 75th percentile for carpenters ($38.74 an hour) would add about $860 to the statewide midpoint; one at the 25th percentile ($22.85) would take off about $580. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.
BLS counts 2,936,050 jobs across Missouri (May 2025), which is 1.9% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Carpenters (47-2031) | 70% | $22.85 | $29.25 | $38.74 | $29.12 | 1.00 | state |
| Floor layers (except carpet, wood and hard tiles) (47-2042) | 30% | $20.32 | $26.30 | $35.80 | $27.15 | 0.97 | state |
| Blended | 100% | 0.99 | |||||
Missouri metro-by-metro prices
1 of the 6 metros sit above the statewide midpoint of $8,800, and the top-to-bottom gap is 20%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.
| Metro | Range (500 sq ft) | Midpoint | vs. state |
|---|---|---|---|
| St. Louis, MO | $6,000 – $13,500 | $9,750 | +11% |
| Kansas City, MO | $5,300 – $12,000 | $8,600 | −2% |
| Jefferson City, MO | $5,200 – $11,800 | $8,500 | −3% |
| Columbia, MO | $5,150 – $11,800 | $8,450 | −4% |
| Springfield, MO | $5,050 – $11,500 | $8,300 | −6% |
| Joplin, MO | $4,950 – $11,300 | $8,150 | −7% |
Related projects, priced for Missouri
Each project weights the trades differently, so Missouri's wage level does not push every price by the same amount. Compared with the US midpoint, tile flooring is +2% and laminate flooring −2%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Laminate flooring | 500 sq ft | $1,950 – $6,800 | −2% |
| Tile flooring | 200 sq ft | $2,600 – $10,100 | +2% |
| Kitchen remodel | 120 sq ft | $18,100 – $30,700 | −2% |
| Bathroom remodel | 45 sq ft | $4,750 – $23,600 | +1% |
How Missouri compares with nearby states
Missouri ranks 21 of 51 (the 50 states plus DC) for hardwood floor, where 1 is the most expensive. The costliest is Hawaii at $11,100 and the cheapest Oklahoma at $7,700, both for 500 sq ft at the midpoint. Missouri sits at $8,800. The five states closest by workforce center are listed below.
| State | Distance | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Iowa | 220 miles away | $5,200 – $11,800 | $8,500 | −3% |
| Arkansas | 230 miles away | $4,750 – $10,900 | $7,800 | −11% |
| Kansas | 250 miles away | $5,100 – $11,600 | $8,300 | −5% |
| Nebraska | 270 miles away | $5,050 – $11,500 | $8,250 | −6% |
| Illinois | 310 miles away | $6,350 – $14,200 | $10,300 | +17% |
Why two Missouri quotes can differ
Solid versus engineered
Solid hardwood is $11-$25 per sq ft installed and engineered hardwood is $9-$20 (HomeGuide).
Materials and labor
Materials are $6-$15 per sq ft and installation labor adds $3-$10 per sq ft.
Layout
Room shape, stairs and installation method change the labor side.
Permit
Flooring rarely needs a permit, so no permit fee is included in this estimate.
Basic, standard or premium: Missouri prices
Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from one room (200 sq ft) to whole house (1,200 sq ft).
Basic
$5,350 to $8,100
Standard solid oak, simple layout
Standard
$7,400 to $10,100
Wider planks or a better grade, some stairs
Premium
$9,450 to $12,200
Exotic species, herringbone or complex layout
| Size | Basic | Standard | Premium |
|---|---|---|---|
| one room (200 sq ft) | $2,150 – $3,250 | $2,950 – $4,050 | $3,800 – $4,900 |
| main floor (500 sq ft) | $5,350 – $8,100 | $7,400 – $10,100 | $9,450 – $12,200 |
| whole house (1,200 sq ft) | $12,900 – $19,400 | $17,800 – $24,300 | $22,700 – $29,300 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $7,400 to $10,100 for Missouri is attached.
A detailed PDF report of this estimate, $9
The report lays out the hardwood flooring numbers for Missouri line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Hardwood flooring in Missouri: your questions
+How much does it cost to install hardwood flooring in Missouri?
$5,350 to $12,200 for 500 sq ft, using statewide wages and prices. Metro areas inside Missouri can sit above or below that.
+Which city in Missouri is cheapest for hardwood floor?
Joplin at about $8,150 (midpoint, 500 sq ft). The priciest is St. Louis at $9,750.
+Is hardwood floor cheaper in Missouri than the US average?
It is 2% cheaper: $8,800 against $9,000 for 500 sq ft at the midpoint.
+What share of the price is labor in Missouri?
About 42% ($3,750). Materials are 58%. Statewide labor for this job is weighted 0.99x the national wage level.
+What do carpenters earn in Missouri?
The BLS statewide median is $29.25 an hour, against $29.12 for the US. The 25th to 75th percentile range is $22.85 to $38.74.
+Where does Missouri rank for hardwood floor costs?
21st most expensive of 51 (the 50 states plus DC) at the midpoint, $8,800 for 500 sq ft. Rank 1 is the costliest.
+What do basic and premium hardwood floor work cost in Missouri?
For 500 sq ft, basic work runs $5,350 to $8,100 and premium work $9,450 to $12,200. Basic means: standard solid oak, simple layout. Premium means: exotic species, herringbone or complex layout.
Hardwood flooring by city in Missouri
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.