Skip to content
CostLocal

Front door cost in Spokane, WA

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (1 door)
$520 – $2,600
Per door
$518 – $2,614
before permit
Versus US midpoint
+4%
US $1,500
Rank of 300 metros
#43
1 = most expensive

A new front door in Spokane, WA usually costs $520 to $2,600 for 1 door. That works out to about $518 to $2,614 per door before permits. Compared with the national midpoint that is $65 more. Building materials run about 5% above the US average here (BEA goods price index 105.0).

Estimate your front door cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Fiberglass door with sidelight trim or glass

Estimated cost for 1 door in Spokane, WA, standard level

$1,150 to $2,000

About $1,147 to $1,985 per door before permits. Labor is about 26% of the bill.

Cost breakdown
PartLowHigh
Materials$780$1,550
Labor$370$450
Permits and fees$0$0
Total$1,150$2,000
Save and get a PDF report

Cost breakdown for 1 door in Spokane, WA

Part of the jobLowMidpointHighShare
Materials$210$1,150$2,10074%
Labor$310$410$51026%
Permits and fees$0$0$00%
Total$520$1,550$2,600100%

What is behind the Spokane number

Labor is 26% of the midpoint bill here, against 27% nationally. The mix of trades behind this job is carpenters (85%), general maintenance and repair workers (15%). We weight each trade's local median wage by that share and compare it with the national median. In Spokane the blended ratio comes out at 1.03.

Materials are scaled with BEA's regional price parity for goods. Spokane is at 105.0 against 100 for the US, so a materials line of $1,100 nationally becomes $1,150 here (midpoint, 1 door). Permits follow the all-items index of 100.3: $0 to $0.

Is Spokane cheap or dear? The local comparison

Of the five closest metros, 2 are cheaper than Spokane. Coeur d'Alene is the lowest at about $1,450 (midpoint, 1 door), 55 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Spokane, WAthis page$520 – $2,600$1,550
Coeur d'Alene, ID55 miles$470 – $2,400$1,450−9%
Kennewick, WA140 miles$530 – $2,650$1,600+1%
Missoula, MT175 miles$480 – $2,400$1,450−8%
Yakima, WA185 miles$520 – $2,600$1,550level
Seattle, WA200 miles$580 – $2,700$1,650+5%
Washington (statewide)$570 – $2,700$1,650+4%
United States$500 – $2,500$1,500−4%

Out of the 300 metros we cover, Spokane ranks #43 for the cost of this job (#1 is the most expensive). Statewide, Spokane is 4% below the Washington figure.

Elsewhere in Washington

Washington metros compared with Spokane
MetroSizeRangeMidpointvs. here
Seattle, WA2,086,210 jobs$580 – $2,700$1,650+5%
Olympia, WA130,300 jobs$530 – $2,650$1,600+1%
Kennewick, WA129,490 jobs$530 – $2,650$1,600+1%
Yakima, WA97,010 jobs$520 – $2,600$1,550level
Bremerton, WA93,740 jobs$540 – $2,650$1,600+2%
Bellingham, WA91,390 jobs$570 – $2,700$1,650+5%

Metros of a similar size

Big cities and small ones price differently, so here is Spokane against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Lakeland, FL265,280 jobs$430 – $2,300$1,350−12%
Scranton, PA255,620 jobs$500 – $2,500$1,500−4%
Huntsville, AL266,650 jobs$440 – $2,350$1,400−11%
Lancaster, PA252,230 jobs$480 – $2,500$1,500−5%

Specs and site conditions that change a Spokane bid

  • Double doors

    A double front door costs $1,500-$6,500+ installed; the doors alone are $1,200-$5,000.

  • Frame

    Frame repair adds $75-$200+; rebuilding the opening for a new size costs $7-$20 per linear foot for framing.

  • Paint

    Painting an unfinished door adds $125-$225; door and trim together are $150-$400.

Spokane: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Spokane. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from single entry door to front and side doors.

Basic

$520 to $1,350

Basic steel door, same size opening

Standard

$1,150 to $2,000

Fiberglass door with sidelight trim or glass

Premium

$1,800 to $2,600

Wood or custom door, frame work needed

Cost by size and quality level
SizeBasicStandardPremium
single entry door$520 – $1,350$1,150 – $2,000$1,800 – $2,600
front and side doors$1,050 – $2,700$2,300 – $3,950$3,550 – $5,250

Spokane weather and the front door calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Spokane Felts Fld (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For exterior installation, the comfortable months in Spokane are March through November: 9 of 12. Outside them, January, February and December have an average daytime high under 45°F.

In January, February and December the average high stays below 45°F. Sealants, adhesives and some materials, such as vinyl, are harder to install well in the cold, and short daylight cuts the working day.

Spokane gets about 17 inches of precipitation in a normal year. The wettest months are January, November and December (2.2 inches in December). Inside the workable window, July and August are the driest, at 0.7 and 0.5 inches. The station averages about 29 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Spokane Felts Fld (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan38262.0Cold
Feb43271.3Cold
Mar51321.8Workable
Apr60371.5Workable
May70441.7Workable
Jun76501.5Workable
Jul87560.7Workable
Aug86550.5Workable
Sep76470.7Workable
Oct60381.5Workable
Nov45312.0Workable
Dec37262.2Cold

What local crews earn in Spokane

The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Spokane the blend is 1.03.

Carpenters (47-2031), 85% of the weighting: a median of $29.76 an hour, in line with the US median of $29.12. The middle half of them earn between $27.92 and $36.43 an hour. About 2,020 work in the metro. That is 79.0 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

For general maintenance and repair workers (49-9071, weighted 15%) the local median is $25.13 an hour, which is 5% above the national $23.84. The middle half of them earn between $21.88 and $31.07 an hour. BLS counts 2,430 of them working in the area, 95.0 for every 10,000 jobs (US: 98.4), so the local bench is about average.

A quick sensitivity check: moving the lead trade (carpenters) from the median to the 75th percentile wage adds about $80 to the midpoint estimate; the 25th percentile takes off about $20. That is a swing of roughly 1.4% to 5.0% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Spokane-Spokane Valley has 255,820 jobs in total (BLS, May 2025), ranking 101st by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)85%$27.92$29.76$36.43$29.121.02metro
General maintenance and repair workers (49-9071)15%$21.88$25.13$31.07$23.841.05metro
Blended100%1.03

Planning more than one job in Spokane?

Jobs that often go together with front door are priced below at their usual sizes, using the same Spokane wage and price inputs. Compared with national midpoints, garage door comes out highest (+6%) and patio door lowest (+4%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Storm door1 door$360 – $990+4%
Patio door1 door$620 – $6,200+4%
Window replacement10 windows$4,700 – $15,700+4%
Garage door1 door$740 – $3,900+6%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,150 to $2,000 for Spokane, WA is attached.

A detailed PDF report of this estimate, $9

The report lays out the front door numbers for Spokane, WA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Front door in Spokane: your questions

+How much does it cost to replace a front door in Spokane?

For 1 door, expect $520 to $2,600 in the Spokane area. A standard-spec job lands at $1,150 to $2,000. Small jobs usually cost more per door and large ones less.

+What is the price per door for front door in Spokane?

About $518 to $2,614 per door for materials and labor, plus $0 to $0 for the permit if one is needed. The US range is $500 to $2,500.

+Is front door cheaper in Spokane or Coeur d'Alene?

Coeur d'Alene is 55 miles away. The midpoint for 1 door there is $1,450, which is 9% less than Spokane ($1,550). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Spokane?

About 26% at the midpoint, or $410 out of $1,550. Materials are 74% and permits 0%. Nationally, labor is 27%.

+What would front and side doors cost in Spokane?

$1,050 to $5,250. Pick a different size in the estimator above to get your own number.

+Does front door need a permit in Spokane?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $0 for fees in the Spokane area (our national range of $0 to $0 scaled by the local price level).

+Is Spokane expensive for front door compared with the rest of Washington?

Spokane is 4% below the Washington statewide estimate ($1,650 at the midpoint). We cover 7 metros in Washington; see the state page to compare them.

+What do carpenters earn in Spokane?

The BLS median is $29.76 an hour in the Spokane area, compared with $29.12 nationally. The 25th to 75th percentile range is $27.92 to $36.43.

+What do basic and premium front door work cost in Spokane?

For 1 door, basic work runs $520 to $1,350 and premium work $1,800 to $2,600. Basic means: basic steel door, same size opening. Premium means: wood or custom door, frame work needed.

+When is the best time to replace a front door in Spokane?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through November. July and August are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

Front door near Spokane

Front door: all pricesFront door in WashingtonAll projects in SpokaneWashington cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = HomeGuide's door prices, from about $200 for a basic steel door to $2,000 for higher-end fiberglass or wood.