Joplin homeowners pay roughly $440 to $2,300 to replace a front door at 1 door, or $437 to $2,298 per door (permit not included). Against the US midpoint, Joplin is 9% lower. Carpenters earn a median of $23.34 an hour in the Joplin area, 20% below the US median of $29.12.

Estimate your front door cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Fiberglass door with sidelight trim or glass

Estimated cost for 1 door in Joplin, MO, standard level

$1,000 to $1,750

About $995 to $1,740 per door before permits. Labor is about 24% of the bill.

Cost breakdown
PartLowHigh
Materials$700$1,400
Labor$300$360
Permits and fees$0$0
Total$1,000$1,750
Save and get a PDF report

Cost breakdown for 1 door in Joplin, MO

Part of the jobLowMidpointHighShare
Materials$190$1,050$1,90076%
Labor$250$330$41024%
Permits and fees$0$0$00%
Total$440$1,350$2,300100%

What is behind the Joplin number

We price the labor side from BLS wage data for 2 trades: carpenters at 85%, general maintenance and repair workers at 15%. Weighted together, Joplin wages are 0.83 times the national level. Labor makes up about 24% of the midpoint estimate (27% at national prices).

On the materials line, the BEA goods price index for the Joplin metro is 94.2 (US = 100). The midpoint materials bill for 1 door comes to $1,050, compared with $1,100 at national prices. Permit and inspection fees are scaled by the broader index (85.7) and land at $0 to $0.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Joplin is 0.83 times the national level.

For carpenters (47-2031, weighted 85%) the local median is $23.34 an hour, which is 20% below the national $29.12. The middle half of them earn between $19.37 and $32.04 an hour. BLS counts 300 of them working in the area, 34.4 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

General maintenance and repair workers (49-9071), 15% of the weighting: a median of $23.43 an hour, in line with the US median of $23.84. The middle half of them earn between $18.72 and $30.15 an hour. About 1,020 work in the metro. That is 117.0 per 10,000 jobs, compared with 98.4 nationally, which suggests plenty of local crews to bid.

Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($32.04 an hour) instead of the median, the labor line grows by about $100. At the 25th percentile ($19.37) it shrinks by about $45. The total moves by 7.4% or 3.4%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 87,190 jobs in the Joplin area. That makes it the 224th largest of the 300 metros we cover, with 0.06% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)85%$19.37$23.34$32.04$29.120.80metro
General maintenance and repair workers (49-9071)15%$18.72$23.43$30.15$23.840.98metro
Blended100%0.83

How Joplin compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 1 door range from $1,300 to $1,450 across Joplin and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Joplin, MOthis page$440 – $2,300$1,350
Fayetteville, AR70 miles$440 – $2,300$1,350level
Springfield, MO75 miles$450 – $2,300$1,400+1%
Tulsa, OK110 miles$430 – $2,250$1,350−1%
Fort Smith, AR115 miles$400 – $2,250$1,300−4%
Kansas City, MO125 miles$490 – $2,400$1,450+5%
Missouri (statewide)$490 – $2,450$1,450+7%
United States$500 – $2,500$1,500+10%

Across 300 US metros, Joplin comes in at #263 from the top. The priciest is Honolulu, HI at $1,800; the cheapest is Brownsville, TX at $1,300 (midpoints, 1 door). Statewide, Joplin is 6% below the Missouri figure.

Other Missouri metros

Missouri metros compared with Joplin
MetroSizeRangeMidpointvs. here
St. Louis, MO1,341,320 jobs$550 – $2,600$1,550+14%
Kansas City, MO1,096,110 jobs$490 – $2,400$1,450+5%
Springfield, MO223,030 jobs$450 – $2,300$1,400+1%
Columbia, MO107,680 jobs$470 – $2,350$1,400+3%
Jefferson City, MO80,220 jobs$470 – $2,350$1,400+3%

Cities with a workforce like Joplin's

Big cities and small ones price differently, so here is Joplin against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Monroe, LA87,500 jobs$430 – $2,300$1,350−1%
Daphne, AL87,120 jobs$430 – $2,300$1,350level
Bloomington, IL88,110 jobs$550 – $2,500$1,500+11%
Eau Claire, WI86,060 jobs$490 – $2,350$1,450+4%

When to schedule front door in Joplin

We use NOAA's 1991-2020 climate normals for Joplin Regional Airport (5 miles from the city center). These are 30-year monthly averages, not forecasts.

September through June is the stretch where exterior installation runs into the fewest weather problems in Joplin (10 of 12 months). July and August have an average daytime high of 90°F or more.

Joplin gets about 46 inches of precipitation in a normal year. The wettest months are April, May and June (6.6 inches in May). Inside the workable window, January and February are the driest, at 1.9 and 2.0 inches. The station averages about 53 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Joplin Regional Airport (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan45251.9Workable
Feb50292.0Workable
Mar60373.3Workable
Apr69475.0Workable
May77566.6Workable
Jun86655.6Workable
Jul90704.0Hot
Aug90683.4Hot
Sep82594.2Workable
Oct71483.8Workable
Nov58373.3Workable
Dec48292.6Workable

Why two Joplin quotes can differ

  • Frame

    Frame repair adds $75-$200+; rebuilding the opening for a new size costs $7-$20 per linear foot for framing.

  • Paint

    Painting an unfinished door adds $125-$225; door and trim together are $150-$400.

  • Door material

    Basic steel doors run about $200-$600 for the door; fiberglass and wood go to $2,000 (HomeGuide).

Cost by quality level and size in Joplin

Three bands are cut from the same cited range and localized for Joplin wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 2 common sizes.

Basic

$440 to $1,200

Basic steel door, same size opening

Standard

$1,000 to $1,750

Fiberglass door with sidelight trim or glass

Premium

$1,550 to $2,300

Wood or custom door, frame work needed

Cost by size and quality level
SizeBasicStandardPremium
single entry door$440 – $1,200$1,000 – $1,750$1,550 – $2,300
front and side doors$870 – $2,350$2,000 – $3,500$3,100 – $4,600

What nearby projects cost in Joplin

Because every project leans on different trades, Joplin's wage level does not move all prices equally. Against the US midpoint, garage door runs −8% and patio door −10%.

Related projects with local prices
ProjectSizeRangevs. US
Storm door1 door$310 – $860−10%
Patio door1 door$550 – $5,350−10%
Window replacement10 windows$4,100 – $13,900−8%
Garage door1 door$640 – $3,400−8%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,000 to $1,750 for Joplin, MO is attached.

A detailed PDF report of this estimate, $9

The report lays out the front door numbers for Joplin, MO line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Front door in Joplin: your questions

+How much does it cost to replace a front door in Joplin?

For 1 door, expect $440 to $2,300 in the Joplin area. A standard-spec job lands at $1,000 to $1,750. Small jobs usually cost more per door and large ones less.

+What is the price per door for front door in Joplin?

About $437 to $2,298 per door for materials and labor, plus $0 to $0 for the permit if one is needed. The US range is $500 to $2,500.

+Is front door cheaper in Joplin or Fayetteville?

Fayetteville is 70 miles away. The midpoint for 1 door there is $1,350, which is 0% less than Joplin ($1,350). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Joplin?

About 24% at the midpoint, or $330 out of $1,350. Materials are 76% and permits 0%. Nationally, labor is 27%.

+What would front and side doors cost in Joplin?

$870 to $4,600. Pick a different size in the estimator above to get your own number.

+Does front door need a permit in Joplin?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $0 for fees in the Joplin area (our national range of $0 to $0 scaled by the local price level).

+Is Joplin expensive for front door compared with the rest of Missouri?

Joplin is 6% below the Missouri statewide estimate ($1,450 at the midpoint). We cover 6 metros in Missouri; see the state page to compare them.

+What do carpenters earn in Joplin?

The BLS median is $23.34 an hour in the Joplin area, compared with $29.12 nationally. The 25th to 75th percentile range is $19.37 to $32.04.

+What do basic and premium front door work cost in Joplin?

For 1 door, basic work runs $440 to $1,200 and premium work $1,550 to $2,300. Basic means: basic steel door, same size opening. Premium means: wood or custom door, frame work needed.

+When is the best time to replace a front door in Joplin?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are September through June. January and February are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

Front door near Joplin

Front door: all pricesFront door in MissouriAll projects in JoplinMissouri cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = HomeGuide's door prices, from about $200 for a basic steel door to $2,000 for higher-end fiberglass or wood.