Skip to content
CostLocal

French drain cost in St. Cloud, MN

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (60 linear ft)
$690 – $2,450
Per linear ft
$11.50 – $40.50
before permit
Versus US midpoint
+16%
US $1,350
Rank of 300 metros
#46
1 = most expensive

A French drain in St. Cloud, MN usually costs $690 to $2,450 for 60 linear ft. That works out to about $11.50 to $40.50 per linear ft before permits. Compared with the national midpoint that is $210 more. Construction laborers earn a median of $27.80 an hour in the St. Cloud area, 23% above the US median of $22.66.

Estimate your french drain cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard drain with fabric, gravel and a pop-up outlet

Estimated cost for 60 linear ft in St. Cloud, MN, standard level

$1,200 to $1,900

About $20.50 to $32 per linear ft before permits. Labor is about 60% of the bill.

Cost breakdown
PartLowHigh
Materials$480$760
Labor$740$1,150
Permits and fees$0$0
Total$1,200$1,900
Save and get a PDF report

Cost breakdown for 60 linear ft in St. Cloud, MN

Part of the jobLowMidpointHighShare
Materials$270$620$96040%
Labor$420$950$1,45060%
Permits and fees$0$0$00%
Total$690$1,550$2,450100%

Why St. Cloud prices look the way they do

We price the labor side from BLS wage data for 3 trades: construction laborers at 50%, operating engineers and other construction equipment operators at 30%, pipelayers at 20%. Weighted together, St. Cloud wages are 1.35 times the national level. Labor makes up about 60% of the midpoint estimate (52% at national prices).

Materials are scaled with BEA's regional price parity for goods. St. Cloud is at 95.4 against 100 for the US, so a materials line of $650 nationally becomes $620 here (midpoint, 60 linear ft). Permits follow the all-items index of 87.6: $0 to $0.

Data note: 20% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in St. Cloud. The wage table below marks each row.

Related projects, priced for St. Cloud

Jobs that often go together with French drain are priced below at their usual sizes, using the same St. Cloud wage and price inputs. Compared with national midpoints, sprinkler system comes out highest (+15%) and concrete slab lowest (+3%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Retaining wall200 sq ft of wall face$8,250 – $14,700+12%
Gravel driveway1,000 sq ft$2,800 – $11,300+11%
Sod installation1,500 sq ft$1,550 – $3,400+4%
Concrete slab400 sq ft$2,550 – $5,300+3%
Sprinkler system4,000 sq ft of lawn$4,600 – $11,500+15%
Inground pool450 sq ft$41,100 – $128,000+14%

French drain: what moves the price in St. Cloud

  • Depth and soil

    Rocky or clay soil and long trenches raise excavation time.

  • Crawl space drains

    A crawl space French drain is $2,000-$8,000 installed.

  • Exterior versus interior

    A shallow exterior French drain is $10-$35 per linear foot; an interior basement drain is $40-$85 per foot, or $4,000-$17,000 installed (HomeGuide).

What local crews earn in St. Cloud

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For St. Cloud the blend is 1.35.

For construction laborers (47-2061, weighted 50%) the local median is $27.80 an hour, which is 23% above the national $22.66. The middle half of them earn between $23.11 and $36.92 an hour. BLS counts 1,470 of them working in the area, 141.5 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Operating engineers and other construction equipment operators (47-2073), 30% of the weighting: a median of $38.24 an hour, 33% above the US median of $28.78. The middle half of them earn between $30.11 and $47.30 an hour. About 700 work in the metro. That is 67.4 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

Pipelayers (47-2151) carry 20% of the labor weighting. BLS does not publish this trade for the St. Cloud metro, so we used the Minnesota statewide median: $39.41 an hour against $23.56 for the US. The middle half of them earn between $36.46 and $45.69 an hour.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $140 to the midpoint estimate; the 25th percentile takes off about $75. That is a swing of roughly 4.6% to 9.0% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

St. Cloud has 103,920 jobs in total (BLS, May 2025), ranking 197th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$23.11$27.80$36.92$22.661.23metro
Operating engineers and other construction equipment operators (47-2073)30%$30.11$38.24$47.30$28.781.33metro
Pipelayers (47-2151)20%$36.46$39.41$45.69$23.561.67state
Blended100%1.35

St. Cloud weather and the french drain calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, St Cloud Rgnl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For digging, grading and setting material in the ground, the comfortable months in St. Cloud are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low at or below freezing (32°F).

In January, February, March, April, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 172 days a year with a low at or below 32°F at this station.

St. Cloud gets about 28 inches of precipitation in a normal year, including roughly 48 inches of snow. The wettest months are May, June and August (4.0 inches in August). Inside the workable window, September and October are the driest, at 3.0 and 2.6 inches. The station averages about 9 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, St Cloud Rgnl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan2130.7Cold
Feb2670.8Cold
Mar39201.6Cold
Apr54322.6Cold
May68453.7Workable
Jun77553.8Workable
Jul82593.6Workable
Aug79564.0Workable
Sep71483.0Workable
Oct56362.6Workable
Nov39231.4Cold
Dec26100.9Cold

St. Cloud: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to St. Cloud. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from short run (30 linear ft) to long run (120 linear ft).

Basic

$690 to $1,400

Shallow yard drain, easy digging

Standard

$1,200 to $1,900

Standard drain with fabric, gravel and a pop-up outlet

Premium

$1,750 to $2,450

Deep or long drain, hard soil, dry well or sump discharge

Cost by size and quality level
SizeBasicStandardPremium
short run (30 linear ft)$350 – $690$610 – $960$870 – $1,200
side yard (60 linear ft)$690 – $1,400$1,200 – $1,900$1,750 – $2,450
long run (120 linear ft)$1,400 – $2,800$2,450 – $3,800$3,450 – $4,850

Is St. Cloud cheap or dear? The local comparison

Of the five closest metros, 2 are cheaper than St. Cloud. Fargo is the lowest at about $1,350 (midpoint, 60 linear ft), 150 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
St. Cloud, MNthis page$690 – $2,450$1,550
Minneapolis, MN70 miles$740 – $2,600$1,650+6%
Fargo, ND150 miles$600 – $2,100$1,350−14%
Rochester, MN155 miles$700 – $2,450$1,600+1%
Duluth, MN155 miles$700 – $2,450$1,550+1%
Eau Claire, WI160 miles$690 – $2,400$1,550level
Minnesota (statewide)$720 – $2,500$1,600+3%
United States$600 – $2,100$1,350−14%

Out of the 300 metros we cover, St. Cloud ranks #46 for the cost of this job (#1 is the most expensive). Statewide, St. Cloud is 3% below the Minnesota figure.

Elsewhere in Minnesota

Minnesota metros compared with St. Cloud
MetroSizeRangeMidpointvs. here
Minneapolis, MN1,951,650 jobs$740 – $2,600$1,650+6%
Duluth, MN124,710 jobs$700 – $2,450$1,550+1%
Rochester, MN122,980 jobs$700 – $2,450$1,600+1%

Metros of a similar size

Big cities and small ones price differently, so here is St. Cloud against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Champaign, IL105,500 jobs$670 – $2,350$1,500−3%
Gainesville, GA103,870 jobs$530 – $1,850$1,200−23%
Hagerstown, MD107,170 jobs$570 – $2,000$1,300−18%
Charleston, WV103,450 jobs$580 – $2,000$1,300−17%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,200 to $1,900 for St. Cloud, MN is attached.

Detailed french drain report for St. Cloud, MN, $9

The report lays out the french drain numbers for St. Cloud, MN line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

French drain in St. Cloud: your questions

+How much does it cost to install a French drain in St. Cloud?

For 60 linear ft, expect $690 to $2,450 in the St. Cloud area. A standard-spec job lands at $1,200 to $1,900. Small jobs usually cost more per linear ft and large ones less.

+What is the price per linear ft for French drain in St. Cloud?

About $11.50 to $40.50 per linear ft for materials and labor, plus $0 to $0 for the permit if one is needed. The US range is $10 to $35.

+Is French drain cheaper in St. Cloud or Minneapolis?

Minneapolis is 70 miles away. The midpoint for 60 linear ft there is $1,650, which is 6% more than St. Cloud ($1,550). Wage and materials indexes both feed that gap.

+How much of the bill is labor in St. Cloud?

About 60% at the midpoint, or $950 out of $1,550. Materials are 40% and permits 0%. Nationally, labor is 52%.

+What would side yard (60 linear ft) cost in St. Cloud?

$690 to $2,450. Pick a different size in the estimator above to get your own number.

+Does French drain need a permit in St. Cloud?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $0 for fees in the St. Cloud area (our national range of $0 to $0 scaled by the local price level).

+Is St. Cloud expensive for French drain compared with the rest of Minnesota?

St. Cloud is 3% below the Minnesota statewide estimate ($1,600 at the midpoint). We cover 4 metros in Minnesota; see the state page to compare them.

+What do construction laborers earn in St. Cloud?

The BLS median is $27.80 an hour in the St. Cloud area, compared with $22.66 nationally. The 25th to 75th percentile range is $23.11 to $36.92.

+What do basic and premium French drain work cost in St. Cloud?

For 60 linear ft, basic work runs $690 to $1,400 and premium work $1,750 to $2,450. Basic means: shallow yard drain, easy digging. Premium means: deep or long drain, hard soil, dry well or sump discharge.

+When is the best time to install a French drain in St. Cloud?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

French drain near St. Cloud

French drain: all pricesFrench drain in MinnesotaAll projects in St. CloudMinnesota cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 48% of the installed price, from Cost to Renovate's mid-range 'Outdoor Living' category split (44% labor, 48% materials). It is a category average, not a French-drain figure, so the materials line here is a rough one.