French drain cost in Santa Cruz, CA

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (60 linear ft)
$710 – $2,500
Per linear ft
$12 – $41.50
before permit
Versus US midpoint
+19%
US $1,350
Rank of 300 metros
#23
1 = most expensive

A French drain in Santa Cruz, CA usually costs $710 to $2,500 for 60 linear ft. That works out to about $12 to $41.50 per linear ft before permits. Compared with the national midpoint that is $250 more. Construction laborers earn a median of $28.13 an hour in the Santa Cruz area, 24% above the US median of $22.66.

Estimate your french drain cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard drain with fabric, gravel and a pop-up outlet

Estimated cost for 60 linear ft in Santa Cruz, CA, standard level

$1,250 to $1,950

About $21 to $32.50 per linear ft before permits. Labor is about 57% of the bill.

Cost breakdown
PartLowHigh
Materials$530$830
Labor$720$1,100
Permits and fees$0$0
Total$1,250$1,950
Save and get a PDF report

Cost breakdown for 60 linear ft in Santa Cruz, CA

Part of the jobLowMidpointHighShare
Materials$300$680$1,05043%
Labor$410$920$1,45057%
Permits and fees$0$0$00%
Total$710$1,600$2,500100%

Why Santa Cruz prices look the way they do

Labor is 57% of the midpoint bill here, against 52% nationally. The mix of trades behind this job is construction laborers (50%), operating engineers and other construction equipment operators (30%), pipelayers (20%). We weight each trade's local median wage by that share and compare it with the national median. In Santa Cruz the blended ratio comes out at 1.31.

Materials are scaled with BEA's regional price parity for goods. Santa Cruz is at 105.2 against 100 for the US, so a materials line of $650 nationally becomes $680 here (midpoint, 60 linear ft). Permits follow the all-items index of 109.9: $0 to $0.

Data note: 20% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Santa Cruz. The wage table below marks each row.

Planning more than one job in Santa Cruz?

Jobs that often go together with French drain are priced below at their usual sizes, using the same Santa Cruz wage and price inputs. Compared with national midpoints, gravel driveway comes out highest (+15%) and concrete slab lowest (+10%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Retaining wall200 sq ft of wall face$7,950 – $14,800+11%
Gravel driveway1,000 sq ft$2,900 – $11,700+15%
Sod installation1,500 sq ft$1,700 – $3,700+12%
Concrete slab400 sq ft$2,700 – $5,700+10%
Sprinkler system4,000 sq ft of lawn$4,450 – $11,200+12%
Inground pool450 sq ft$40,900 – $127,500+13%

Why two Santa Cruz quotes can differ

  • Where the water goes

    A sump pump adds $500-$1,800 and a dry well $50-$3,000+. Discharging to a storm drain can mean extra permit fees.

  • Depth and soil

    Rocky or clay soil and long trenches raise excavation time.

  • Crawl space drains

    A crawl space French drain is $2,000-$8,000 installed.

How Santa Cruz compares

Same job, same size (60 linear ft), priced for the nearest metros. San Francisco is the priciest of the group at $1,900. Merced is the cheapest at $1,550.

Comparison with nearby areas
AreaRangeMidpointvs. here
Santa Cruz, CAthis page$710 – $2,500$1,600
San Jose, CA35 miles$820 – $2,850$1,850+15%
San Francisco, CA55 miles$840 – $2,950$1,900+19%
Salinas, CA65 miles$730 – $2,550$1,650+3%
Modesto, CA65 miles$740 – $2,600$1,650+4%
Merced, CA70 miles$700 – $2,450$1,550−2%
California (statewide)$740 – $2,600$1,650+4%
United States$600 – $2,100$1,350−16%

Out of the 300 metros we cover, Santa Cruz ranks #23 for the cost of this job (#1 is the most expensive). Statewide, Santa Cruz is 4% below the California figure.

Elsewhere in California

California metros compared with Santa Cruz
MetroSizeRangeMidpointvs. here
Los Angeles, CA6,271,560 jobs$750 – $2,600$1,700+5%
San Francisco, CA2,373,920 jobs$840 – $2,950$1,900+19%
Riverside, CA1,716,760 jobs$710 – $2,500$1,600level
San Diego, CA1,538,060 jobs$710 – $2,500$1,600level
San Jose, CA1,134,970 jobs$820 – $2,850$1,850+15%
Sacramento, CA1,080,590 jobs$740 – $2,600$1,650+4%

Metros of a similar size

Big cities and small ones price differently, so here is Santa Cruz against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Springfield, IL100,810 jobs$690 – $2,400$1,550−4%
Slidell, LA98,240 jobs$530 – $1,850$1,200−25%
Lake Charles, LA101,690 jobs$550 – $1,950$1,250−22%
Lynchburg, VA97,190 jobs$540 – $1,900$1,200−24%

Pick a size, pick a tier: french drain pricing in Santa Cruz

The cited range is split into basic, standard and premium bands, then scaled to Santa Cruz. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from short run (30 linear ft) to long run (120 linear ft).

Basic

$710 to $1,400

Shallow yard drain, easy digging

Standard

$1,250 to $1,950

Standard drain with fabric, gravel and a pop-up outlet

Premium

$1,800 to $2,500

Deep or long drain, hard soil, dry well or sump discharge

Cost by size and quality level
SizeBasicStandardPremium
short run (30 linear ft)$360 – $710$620 – $980$890 – $1,250
side yard (60 linear ft)$710 – $1,400$1,250 – $1,950$1,800 – $2,500
long run (120 linear ft)$1,400 – $2,850$2,500 – $3,900$3,550 – $5,000

Santa Cruz weather and the french drain calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Santa Cruz (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

Weather is not a serious constraint for digging, grading and setting material in the ground in Santa Cruz: no month in the averages is cold enough (an average overnight low at or below freezing (32°F)) or hot enough (an average daytime high of 90°F or more) to rule it out, so the workable window is all year.

Santa Cruz gets about 31 inches of precipitation in a normal year. The wettest months are January, February and December (6.4 inches in January). The station averages about 6 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Santa Cruz (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan63416.4Workable
Feb64436.1Workable
Mar67444.3Workable
Apr69462.0Workable
May71490.9Workable
Jun74520.2Workable
Jul74540.0Workable
Aug76550.0Workable
Sep77530.1Workable
Oct74501.3Workable
Nov67443.2Workable
Dec62416.0Workable

What local crews earn in Santa Cruz

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Santa Cruz the blend is 1.31.

For construction laborers (47-2061, weighted 50%) the local median is $28.13 an hour, which is 24% above the national $22.66. The middle half of them earn between $22.82 and $36.00 an hour. BLS counts 520 of them working in the area, 52.8 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 30% of the weighting: a median of $36.36 an hour, 26% above the US median of $28.78. The middle half of them earn between $29.43 and $46.56 an hour. About 130 work in the metro. That is 13.2 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

Pipelayers (47-2151) carry 20% of the labor weighting. BLS does not publish this trade for the Santa Cruz metro, so we used the California statewide median: $36.63 an hour against $23.56 for the US. The middle half of them earn between $29.74 and $45.46 an hour.

A quick sensitivity check: moving the lead trade (construction laborers) from the median to the 75th percentile wage adds about $120 to the midpoint estimate; the 25th percentile takes off about $80. That is a swing of roughly 5.1% to 7.6% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Santa Cruz-Watsonville has 98,500 jobs in total (BLS, May 2025), ranking 204th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Construction laborers (47-2061)50%$22.82$28.13$36.00$22.661.24metro
Operating engineers and other construction equipment operators (47-2073)30%$29.43$36.36$46.56$28.781.26metro
Pipelayers (47-2151)20%$29.74$36.63$45.46$23.561.55state
Blended100%1.31

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,250 to $1,950 for Santa Cruz, CA is attached.

Take this estimate with you: PDF report, $9

The report lays out the french drain numbers for Santa Cruz, CA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

French drain in Santa Cruz: your questions

+How much does it cost to install a French drain in Santa Cruz?

For 60 linear ft, expect $710 to $2,500 in the Santa Cruz area. A standard-spec job lands at $1,250 to $1,950. Small jobs usually cost more per linear ft and large ones less.

+What is the price per linear ft for French drain in Santa Cruz?

About $12 to $41.50 per linear ft for materials and labor, plus $0 to $0 for the permit if one is needed. The US range is $10 to $35.

+Is French drain cheaper in Santa Cruz or San Jose?

San Jose is 35 miles away. The midpoint for 60 linear ft there is $1,850, which is 15% more than Santa Cruz ($1,600). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Santa Cruz?

About 57% at the midpoint, or $920 out of $1,600. Materials are 43% and permits 0%. Nationally, labor is 52%.

+What would side yard (60 linear ft) cost in Santa Cruz?

$710 to $2,500. Pick a different size in the estimator above to get your own number.

+Does French drain need a permit in Santa Cruz?

Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $0 for fees in the Santa Cruz area (our national range of $0 to $0 scaled by the local price level).

+Is Santa Cruz expensive for French drain compared with the rest of California?

Santa Cruz is 4% below the California statewide estimate ($1,650 at the midpoint). We cover 23 metros in California; see the state page to compare them.

+What do construction laborers earn in Santa Cruz?

The BLS median is $28.13 an hour in the Santa Cruz area, compared with $22.66 nationally. The 25th to 75th percentile range is $22.82 to $36.00.

+What do basic and premium French drain work cost in Santa Cruz?

For 60 linear ft, basic work runs $710 to $1,400 and premium work $1,800 to $2,500. Basic means: shallow yard drain, easy digging. Premium means: deep or long drain, hard soil, dry well or sump discharge.

+Is there a bad season to install a French drain in Santa Cruz?

Not from a temperature point of view. NOAA's 1991-2020 normals show no month with a freezing-level overnight low or a 90°F-plus average high, so timing is mostly about contractor availability and rain.

French drain near Santa Cruz

French drain: all pricesFrench drain in CaliforniaAll projects in Santa CruzCalifornia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 48% of the installed price, from Cost to Renovate's mid-range 'Outdoor Living' category split (44% labor, 48% materials). It is a category average, not a French-drain figure, so the materials line here is a rough one.