Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,200 – $4,750
Per sq ft
$5.40 – $11
before permit
Versus US midpoint
−9%
US $3,850
Rank of 300 metros
#238
1 = most expensive

Local price for a concrete slab in the Blacksburg area: $2,200 to $4,750 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 9% lower than the US figure. Cement masons and concrete finishers earn a median of $21.87 an hour in the Blacksburg area, 20% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Blacksburg, VA, standard level

$2,950 to $3,950

About $7.05 to $9.25 per sq ft before permits. Labor is about 38% of the bill.

Cost breakdown
PartLowHigh
Materials$1,650$2,250
Labor$1,200$1,450
Permits and fees$140$270
Total$2,950$3,950
Save and get a PDF report

Cost breakdown for 400 sq ft in Blacksburg, VA

Part of the jobLowMidpointHighShare
Materials$1,150$1,950$2,70056%
Labor$990$1,300$1,65038%
Permits and fees$45$210$3706%
Total$2,200$3,450$4,750100%

Why Blacksburg prices look the way they do

Labor is 38% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Blacksburg the blended ratio comes out at 0.83.

Materials are scaled with BEA's regional price parity for goods. Blacksburg is at 96.8 against 100 for the US, so a materials line of $2,000 nationally becomes $1,950 here (midpoint, 400 sq ft). Permits follow the all-items index of 92.7: $45 to $370.

How Blacksburg compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,300 to $3,750 across Blacksburg and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Blacksburg, VAthis page$2,200 – $4,750$3,450
Roanoke, VA35 miles$2,200 – $4,750$3,500+1%
Winston, NC75 miles$2,200 – $4,700$3,450level
Lynchburg, VA75 miles$2,100 – $4,550$3,300−5%
Greensboro, NC85 miles$2,200 – $4,700$3,450level
Charleston, WV95 miles$2,400 – $5,050$3,750+8%
Virginia (statewide)$2,350 – $5,050$3,700+7%
United States$2,450 – $5,200$3,850+10%

Out of the 300 metros we cover, Blacksburg ranks #238 for the cost of this job (#1 is the most expensive). Statewide, Blacksburg is 6% below the Virginia figure.

Elsewhere in Virginia

Virginia metros compared with Blacksburg
MetroSizeRangeMidpointvs. here
Virginia Beach, VA763,060 jobs$2,250 – $4,800$3,500+2%
Richmond, VA660,350 jobs$2,250 – $4,800$3,500+1%
Roanoke, VA153,980 jobs$2,200 – $4,750$3,500+1%
Charlottesville, VA114,780 jobs$2,350 – $4,950$3,650+5%
Lynchburg, VA97,190 jobs$2,100 – $4,550$3,300−5%
Winchester, VA67,740 jobs$2,250 – $4,800$3,500+1%

Metros of a similar size

Big cities and small ones price differently, so here is Blacksburg against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Sioux City, IA75,010 jobs$2,350 – $4,950$3,650+6%
Rapid City, SD73,820 jobs$2,250 – $4,800$3,550+2%
Abilene, TX75,070 jobs$2,150 – $4,600$3,350−3%
Kahului, HI73,750 jobs$3,500 – $7,100$5,300+53%

What nearby projects cost in Blacksburg

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Blacksburg wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−7%) and concrete driveway lowest (−13%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,200 – $7,950−13%
Concrete patio300 sq ft$1,150 – $3,550−11%
Detached garage576 sq ft$26,100 – $52,400−10%
Stamped concrete400 sq ft$2,950 – $7,100−10%
Asphalt driveway600 sq ft$2,850 – $6,850−7%
Gravel driveway1,000 sq ft$2,300 – $9,300−9%

Concrete slab: what moves the price in Blacksburg

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

Who does the work: Blacksburg trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Blacksburg the blend is 0.83.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $21.87 an hour, 20% below the US median of $27.41. The middle half of them earn between $17.99 and $26.56 an hour. About 40 work in the metro. That is 5.4 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $20.03 an hour, which is 12% below the national $22.66. The middle half of them earn between $17.47 and $22.13 an hour.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $24.05 an hour, 16% below the US median of $28.78. The middle half of them earn between $21.55 and $28.88 an hour.

Carpenters (47-2031), 10% of the weighting: a median of $22.87 an hour, 21% below the US median of $29.12. The middle half of them earn between $19.38 and $27.26 an hour. About 340 work in the metro. That is 45.9 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $140 to the midpoint estimate; the 25th percentile takes off about $110. That is a swing of roughly 3.3% to 3.9% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Blacksburg-Christiansburg-Radford has 74,070 jobs in total (BLS, May 2025), ranking 248th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$17.99$21.87$26.56$27.410.80metro
Construction laborers (47-2061)30%$17.47$20.03$22.13$22.660.88metro
Operating engineers and other construction equipment operators (47-2073)10%$21.55$24.05$28.88$28.780.84metro
Carpenters (47-2031)10%$19.38$22.87$27.26$29.120.79metro
Blended100%0.83

The best months for concrete slab in Blacksburg

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Blacksburg Nwso (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Blacksburg are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Blacksburg gets about 43 inches of precipitation in a normal year, including roughly 25 inches of snow. The wettest months are May, June and July (4.5 inches in May). Inside the workable window, September and October are the driest, at 3.5 and 2.9 inches. The station averages about 5 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Blacksburg Nwso (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan42223.2Cold
Feb45242.8Cold
Mar53303.8Cold
Apr64393.8Cold
May72484.5Workable
Jun79574.3Workable
Jul82614.2Workable
Aug81603.6Workable
Sep76533.5Workable
Oct66412.9Workable
Nov55312.9Cold
Dec45253.3Cold

Extras that change the Blacksburg total

Add-ons start from national price ranges and are scaled by 0.90 for Blacksburg, which is the average of the area's wage index (0.83) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$360 – $1,100
Remove old concrete first$720 – $2,150

Blacksburg: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Blacksburg. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,200 to $3,200

4-inch broom-finish slab, light mesh, easy truck access

Standard

$2,950 to $3,950

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,700 to $4,750

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$580 – $940$850 – $1,200$1,100 – $1,450
12x12 (144 sq ft)$820 – $1,250$1,150 – $1,600$1,500 – $1,950
20x20 (400 sq ft)$2,200 – $3,200$2,950 – $3,950$3,700 – $4,750
24x24 garage floor (576 sq ft)$3,150 – $4,550$4,200 – $5,600$5,250 – $6,650
30x40 foundation (1,200 sq ft)$6,500 – $9,300$8,600 – $11,400$10,700 – $13,500

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,950 to $3,950 for Blacksburg, VA is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete slab numbers for Blacksburg, VA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Blacksburg: your questions

+How much does it cost to pour a concrete slab in Blacksburg?

For 400 sq ft, expect $2,200 to $4,750 in the Blacksburg area. A standard-spec job lands at $2,950 to $3,950. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Blacksburg?

About $5.40 to $11 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Blacksburg or Roanoke?

Roanoke is 35 miles away. The midpoint for 400 sq ft there is $3,500, which is 1% more than Blacksburg ($3,450). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Blacksburg?

About 38% at the midpoint, or $1,300 out of $3,450. Materials are 56% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Blacksburg?

$2,200 to $4,750. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Blacksburg?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Blacksburg area (our national range of $50 to $400 scaled by the local price level).

+Is Blacksburg expensive for concrete slab compared with the rest of Virginia?

Blacksburg is 6% below the Virginia statewide estimate ($3,700 at the midpoint). We cover 8 metros in Virginia; see the state page to compare them.

+What do cement masons and concrete finishers earn in Blacksburg?

The BLS median is $21.87 an hour in the Blacksburg area, compared with $27.41 nationally. The 25th to 75th percentile range is $17.99 to $26.56.

+What do basic and premium concrete slab work cost in Blacksburg?

For 400 sq ft, basic work runs $2,200 to $3,200 and premium work $3,700 to $4,750. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Blacksburg?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Blacksburg?

$360 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Blacksburg

Concrete slab: all pricesConcrete slab in VirginiaAll projects in BlacksburgVirginia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.