Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,150 – $3,450
Per sq ft
$3.60 – $10.50
before permit
Versus US midpoint
−12%
US $2,650
Rank of 300 metros
#262
1 = most expensive

Decatur homeowners pay roughly $1,150 to $3,450 to pour a concrete patio at 300 sq ft, or $3.60 to $10.50 per sq ft (permit not included). Against the US midpoint, Decatur is 12% lower. Cement masons and concrete finishers earn a median of $22.02 an hour in the Decatur area, 20% below the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Decatur, AL, standard level

$1,850 to $2,750

About $5.65 to $8.35 per sq ft before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$900$1,150
Labor$800$1,400
Permits and fees$140$260
Total$1,850$2,750
Save and get a PDF report

Cost breakdown for 300 sq ft in Decatur, AL

Part of the jobLowMidpointHighShare
Materials$720$1,000$1,30044%
Labor$360$1,100$1,80047%
Permits and fees$45$200$3509%
Total$1,150$2,300$3,450100%

Where the Decatur price comes from

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, carpenters at 10%, operating engineers and other construction equipment operators at 10%. Weighted together, Decatur wages are 0.81 times the national level. Labor makes up about 47% of the midpoint estimate (51% at national prices).

On the materials line, the BEA goods price index for the Decatur metro is 96.4 (US = 100). The midpoint materials bill for 300 sq ft comes to $1,000, compared with $1,050 at national prices. Permit and inspection fees are scaled by the broader index (87.2) and land at $45 to $350.

Concrete patio: what moves the price in Decatur

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

Pick a size, pick a tier: concrete patio pricing in Decatur

Three bands are cut from the same cited range and localized for Decatur wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$1,150 to $2,050

Plain gray slab, broom finish, flat yard

Standard

$1,850 to $2,750

Colored or stained, saw-cut joints, minor grading

Premium

$2,550 to $3,450

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$410 – $800$700 – $1,100$1,000 – $1,400
12x16 (192 sq ft)$740 – $1,400$1,200 – $1,850$1,700 – $2,350
20x20 (400 sq ft)$1,500 – $2,700$2,400 – $3,600$3,300 – $4,500

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Decatur is 0.81 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $22.02 an hour, which is 20% below the national $27.41. The middle half of them earn between $18.00 and $23.77 an hour. BLS counts 60 of them working in the area, 9.8 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $18.11 an hour, 20% below the US median of $22.66. The middle half of them earn between $15.52 and $23.05 an hour. About 690 work in the metro. That is 112.7 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For carpenters (47-2031, weighted 10%) the local median is $24.50 an hour, which is 16% below the national $29.12. The middle half of them earn between $21.75 and $28.48 an hour. BLS counts 190 of them working in the area, 31.0 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $23.79 an hour, which is 17% below the national $28.78. The middle half of them earn between $21.70 and $28.46 an hour. BLS counts 290 of them working in the area, 47.4 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($23.77 an hour) instead of the median, the labor line grows by about $45. At the 25th percentile ($18.00) it shrinks by about $100. The total moves by 1.9% or 4.3%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 61,240 jobs in the Decatur area. That makes it the 283rd largest of the 300 metros we cover, with 0.04% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$18.00$22.02$23.77$27.410.80metro
Construction laborers (47-2061)30%$15.52$18.11$23.05$22.660.80metro
Carpenters (47-2031)10%$21.75$24.50$28.48$29.120.84metro
Operating engineers and other construction equipment operators (47-2073)10%$21.70$23.79$28.46$28.780.83metro
Blended100%0.81

Related projects, priced for Decatur

Because every project leans on different trades, Decatur's wage level does not move all prices equally. Against the US midpoint, wood deck runs −9% and concrete driveway −14%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,150 – $4,650−11%
Stamped concrete400 sq ft$2,900 – $7,000−12%
Paver patio300 sq ft$2,650 – $4,800−12%
Wood deck300 sq ft$6,850 – $13,700−9%
Concrete driveway600 sq ft$3,150 – $7,800−14%
Asphalt driveway600 sq ft$2,750 – $6,600−10%

How Decatur compares

Same job, same size (300 sq ft), priced for the nearest metros. Nashville is the priciest of the group at $2,450. Tuscaloosa is the cheapest at $2,250.

Comparison with nearby areas
AreaRangeMidpointvs. here
Decatur, ALthis page$1,150 – $3,450$2,300
Huntsville, AL30 miles$1,150 – $3,500$2,300+1%
Birmingham, AL75 miles$1,150 – $3,500$2,350+1%
Tuscaloosa, AL105 miles$1,100 – $3,400$2,250−2%
Chattanooga, TN105 miles$1,150 – $3,550$2,350+2%
Nashville, TN115 miles$1,200 – $3,750$2,450+7%
Alabama (statewide)$1,100 – $3,450$2,250−1%
United States$1,250 – $4,000$2,650+14%

Across 300 US metros, Decatur comes in at #262 from the top. The priciest is Kahului, HI at $3,800; the cheapest is McAllen, TX at $2,100 (midpoints, 300 sq ft). Statewide, Decatur is 1% above the Alabama figure.

Other Alabama metros

Alabama metros compared with Decatur
MetroSizeRangeMidpointvs. here
Birmingham, AL520,290 jobs$1,150 – $3,500$2,350+1%
Huntsville, AL266,650 jobs$1,150 – $3,500$2,300+1%
Mobile, AL172,550 jobs$1,100 – $3,450$2,300−1%
Montgomery, AL165,550 jobs$1,100 – $3,400$2,250−2%
Tuscaloosa, AL108,460 jobs$1,100 – $3,400$2,250−2%
Daphne, AL87,120 jobs$1,150 – $3,450$2,300level

Cities with a workforce like Decatur's

Big cities and small ones price differently, so here is Decatur against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Santa Fe, NM61,770 jobs$1,200 – $3,750$2,450+7%
Dothan, AL60,720 jobs$1,100 – $3,300$2,200−4%
Pueblo, CO61,780 jobs$1,200 – $3,850$2,550+10%
Sheboygan, WI60,630 jobs$1,250 – $4,250$2,750+20%

Optional extras in Decatur

Extras are quoted nationally and then scaled to Decatur by the average of the local wage index (0.81) and goods index (0.96), a factor of 0.89. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$800 – $2,650

When to schedule concrete patio in Decatur

We use NOAA's 1991-2020 climate normals for Decatur Pryor Fld (5 miles from the city center). These are 30-year monthly averages, not forecasts.

March through June and September through October are the stretches where pouring concrete runs into the fewest weather problems in Decatur (6 of 12 months). January, February, November and December have an average overnight low of 40°F or below; July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.

Decatur gets about 49 inches of precipitation in a normal year. The wettest months are February, March and December (5.2 inches in December). Inside the workable window, September and October are the driest, at 3.2 and 3.2 inches. The station averages about 64 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Decatur Pryor Fld (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan51324.6Cold
Feb55355.0Cold
Mar64425.0Workable
Apr73504.5Workable
May81594.2Workable
Jun88673.7Workable
Jul90704.0Hot
Aug90683.0Hot
Sep85613.2Workable
Oct75503.2Workable
Nov62394.0Cold
Dec54355.2Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,850 to $2,750 for Decatur, AL is attached.

Detailed concrete patio report for Decatur, AL, $9

Multi-page report for Decatur, AL: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Decatur: your questions

+How much does it cost to pour a concrete patio in Decatur?

For 300 sq ft, expect $1,150 to $3,450 in the Decatur area. A standard-spec job lands at $1,850 to $2,750. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Decatur?

About $3.60 to $10.50 per sq ft for materials and labor, plus $45 to $350 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Decatur or Huntsville?

Huntsville is 30 miles away. The midpoint for 300 sq ft there is $2,300, which is 1% more than Decatur ($2,300). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Decatur?

About 47% at the midpoint, or $1,100 out of $2,300. Materials are 44% and permits 9%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Decatur?

$740 to $2,350. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Decatur?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $350 for fees in the Decatur area (our national range of $50 to $400 scaled by the local price level).

+Is Decatur expensive for concrete patio compared with the rest of Alabama?

Decatur is 1% above the Alabama statewide estimate ($2,250 at the midpoint). We cover 9 metros in Alabama; see the state page to compare them.

+What do cement masons and concrete finishers earn in Decatur?

The BLS median is $22.02 an hour in the Decatur area, compared with $27.41 nationally. The 25th to 75th percentile range is $18.00 to $23.77.

+What do basic and premium concrete patio work cost in Decatur?

For 300 sq ft, basic work runs $1,150 to $2,050 and premium work $2,550 to $3,450. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Decatur?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and September through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Decatur?

$800 to $2,650 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Decatur

Concrete patio: all pricesConcrete patio in AlabamaAll projects in DecaturAlabama cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.