Concrete driveway cost in Boise, ID
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $3,550 – $8,950
- Per sq ft
- $5.85 – $14.50
- before permit
- Versus US midpoint
- −3%
- US $6,450
- Rank of 300 metros
- #155
- 1 = most expensive
Boise homeowners pay roughly $3,550 to $8,950 to pour a concrete driveway at 600 sq ft, or $5.85 to $14.50 per sq ft (permit not included). Against the US midpoint, Boise is almost level. Cement masons and concrete finishers earn a median of $26.95 an hour in the Boise area, 2% below the US median of $27.41.
Estimate your concrete driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in Boise, ID, standard level
$5,200 to $7,350
About $8.45 to $12 per sq ft before permits. Labor is about 69% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $2,000 |
| Labor | $3,450 | $5,200 |
| Permits and fees | $95 | $150 |
| Total | $5,200 | $7,350 |
Cost breakdown for 600 sq ft in Boise, ID
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,350 | $1,800 | $2,300 | 29% |
| Labor | $2,150 | $4,300 | $6,450 | 69% |
| Permits and fees | $50 | $120 | $200 | 2% |
| Total | $3,550 | $6,250 | $8,950 | 100% |
Why Boise prices look the way they do
We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Boise wages are 0.98 times the national level. Labor makes up about 69% of the midpoint estimate (69% at national prices).
On the materials line, the BEA goods price index for the Boise metro is 96.2 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,800, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (98.4) and land at $50 to $200.
Extras that change the Boise total
Extras are quoted nationally and then scaled to Boise by the average of the local wage index (0.98) and goods index (0.96), a factor of 0.97. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $580 – $1,750 |
| Remove the old driveway | $1,150 – $3,500 |
Why two Boise quotes can differ
Permits and the apron
A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.
Thickness
HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.
Old driveway removal
Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.
What nearby projects cost in Boise
Because every project leans on different trades, Boise's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs +4% and concrete slab −3%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Asphalt driveway | 600 sq ft | $3,150 – $7,750 | +4% |
| Gravel driveway | 1,000 sq ft | $2,450 – $10,100 | −1% |
| Concrete slab | 400 sq ft | $2,400 – $5,050 | −3% |
| Stamped concrete | 400 sq ft | $3,150 – $7,800 | −2% |
| Paver patio | 300 sq ft | $3,000 – $5,450 | level |
| Concrete patio | 300 sq ft | $1,200 – $3,900 | −3% |
Is Boise cheap or dear? The local comparison
Of the five closest metros, 3 are cheaper than Boise. Logan is the lowest at about $5,950 (midpoint, 600 sq ft), 235 miles away.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Boise, IDthis page | $3,550 – $8,950 | $6,250 | |
| Idaho Falls, ID190 miles | $3,450 – $8,750 | $6,100 | −2% |
| Logan, UT235 miles | $3,400 – $8,500 | $5,950 | −5% |
| Salt Lake City, UT235 miles | $3,700 – $9,350 | $6,500 | +4% |
| Bend, OR250 miles | $4,000 – $10,200 | $7,100 | +13% |
| Ogden, UT255 miles | $3,450 – $8,650 | $6,050 | −3% |
| Idaho (statewide) | $3,550 – $9,000 | $6,250 | level |
| United States | $3,650 – $9,200 | $6,450 | +3% |
Across 300 US metros, Boise comes in at #155 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Boise is 0% below the Idaho figure.
Other Idaho metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Idaho Falls, ID | 81,840 jobs | $3,450 – $8,750 | $6,100 | −2% |
| Coeur d'Alene, ID | 72,280 jobs | $3,650 – $9,300 | $6,500 | +4% |
Cities with a workforce like Boise's
Big cities and small ones price differently, so here is Boise against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Charleston, SC | 394,170 jobs | $3,400 – $8,500 | $5,950 | −5% |
| Tucson, AZ | 389,630 jobs | $3,550 – $8,900 | $6,200 | −1% |
| Columbia, SC | 394,200 jobs | $3,300 – $8,300 | $5,800 | −7% |
| Allentown, PA | 377,180 jobs | $3,800 – $9,650 | $6,750 | +8% |
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Boise is 0.98 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $26.95 an hour, which is in line with the national $27.41. The middle half of them earn between $23.13 and $29.50 an hour. BLS counts 1,110 of them working in the area, 28.3 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.
Construction laborers (47-2061), 30% of the weighting: a median of $22.84 an hour, in line with the US median of $22.66. The middle half of them earn between $19.98 and $25.18 an hour. About 4,700 work in the metro. That is 120.0 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.29 an hour, which is in line with the national $28.78. The middle half of them earn between $25.58 and $31.56 an hour. BLS counts 1,730 of them working in the area, 44.2 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.
For carpenters (47-2031, weighted 10%) the local median is $24.45 an hour, which is 16% below the national $29.12. The middle half of them earn between $21.63 and $30.30 an hour. BLS counts 4,080 of them working in the area, 104.1 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($29.50 an hour) instead of the median, the labor line grows by about $210. At the 25th percentile ($23.13) it shrinks by about $310. The total moves by 3.3% or 4.9%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 391,790 jobs in the Boise City area. That makes it the 67th largest of the 300 metros we cover, with 0.25% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $23.13 | $26.95 | $29.50 | $27.41 | 0.98 | metro |
| Construction laborers (47-2061) | 30% | $19.98 | $22.84 | $25.18 | $22.66 | 1.01 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $25.58 | $29.29 | $31.56 | $28.78 | 1.02 | metro |
| Carpenters (47-2031) | 10% | $21.63 | $24.45 | $30.30 | $29.12 | 0.84 | metro |
| Blended | 100% | 0.98 | |||||
When to schedule concrete driveway in Boise
We use NOAA's 1991-2020 climate normals for Boise Air Terminal (5 miles from the city center). These are 30-year monthly averages, not forecasts.
May through June and September through October are the stretches where pouring concrete runs into the fewest weather problems in Boise (4 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below; July and August have an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.
Boise gets about 12 inches of precipitation in a normal year, including roughly 18 inches of snow. The wettest months are January, May and December (1.5 inches in December). Inside the workable window, June and September are the driest, at 0.8 and 0.4 inches. The station averages about 55 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 39 | 26 | 1.4 | Cold |
| Feb | 46 | 29 | 1.0 | Cold |
| Mar | 56 | 35 | 1.3 | Cold |
| Apr | 62 | 40 | 1.2 | Cold |
| May | 72 | 48 | 1.4 | Workable |
| Jun | 81 | 54 | 0.8 | Workable |
| Jul | 93 | 62 | 0.2 | Hot |
| Aug | 91 | 61 | 0.2 | Hot |
| Sep | 80 | 53 | 0.4 | Workable |
| Oct | 65 | 42 | 0.8 | Workable |
| Nov | 49 | 32 | 1.2 | Cold |
| Dec | 39 | 25 | 1.5 | Cold |
Pick a size, pick a tier: concrete driveway pricing in Boise
Three bands are cut from the same cited range and localized for Boise wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$3,550 to $5,700
Plain gray, 4-inch broom finish, flat site
Standard
$5,200 to $7,350
5-inch with rebar and saw-cut joints, a border or one color
Premium
$6,800 to $8,950
6-inch for heavy vehicles, stamped or colored, grading needed
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,450 – $2,350 | $2,150 – $3,050 | $2,800 – $3,700 |
| 2-car (20x24), 480 sq ft | $2,850 – $4,600 | $4,150 – $5,900 | $5,450 – $7,200 |
| 2-car + apron (600 sq ft) | $3,550 – $5,700 | $5,200 – $7,350 | $6,800 – $8,950 |
| 3-car (900 sq ft) | $5,300 – $8,500 | $7,700 – $10,900 | $10,100 – $13,400 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,200 to $7,350 for Boise, ID is attached.
Take this estimate with you: PDF report, $9
Multi-page report for Boise, ID: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete driveway in Boise: your questions
+How much does it cost to pour a concrete driveway in Boise?
For 600 sq ft, expect $3,550 to $8,950 in the Boise area. A standard-spec job lands at $5,200 to $7,350. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete driveway in Boise?
About $5.85 to $14.50 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $6 to $15.
+Is concrete driveway cheaper in Boise or Idaho Falls?
Idaho Falls is 190 miles away. The midpoint for 600 sq ft there is $6,100, which is 2% less than Boise ($6,250). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Boise?
About 69% at the midpoint, or $4,300 out of $6,250. Materials are 29% and permits 2%. Nationally, labor is 69%.
+What would 2-car + apron (600 sq ft) cost in Boise?
$3,550 to $8,950. Pick a different size in the estimator above to get your own number.
+Does concrete driveway need a permit in Boise?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the Boise area (our national range of $50 to $200 scaled by the local price level).
+Is Boise expensive for concrete driveway compared with the rest of Idaho?
Boise is 0% below the Idaho statewide estimate ($6,250 at the midpoint). We cover 3 metros in Idaho; see the state page to compare them.
+What do cement masons and concrete finishers earn in Boise?
The BLS median is $26.95 an hour in the Boise area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.13 to $29.50.
+What do basic and premium concrete driveway work cost in Boise?
For 600 sq ft, basic work runs $3,550 to $5,700 and premium work $6,800 to $8,950. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.
+When is the best time to pour a concrete driveway in Boise?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through June and September through October. June and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Boise?
$580 to $1,750 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete driveway near Boise
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.