Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$10,500 – $21,100
Per sq ft
$35 – $70
before permit
Versus US midpoint
−13%
US $18,100
Rank of 300 metros
#243
1 = most expensive

Jackson homeowners pay roughly $10,500 to $21,100 to build a composite deck at 300 sq ft, or $35 to $70 per sq ft (permit not included). Against the US midpoint, Jackson is 13% lower. Carpenters earn a median of $23.72 an hour in the Jackson area, 19% below the US median of $29.12.

Estimate your composite deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade capped boards with railing and stairs

Add-ons

Estimated cost for 300 sq ft in Jackson, MS, standard level

$13,700 to $17,900

About $45.50 to $59.50 per sq ft before permits. Labor is about 56% of the bill.

Cost breakdown
PartLowHigh
Materials$6,000$7,850
Labor$7,600$9,950
Permits and fees$70$110
Total$13,700$17,900
Save and get a PDF report

Cost breakdown for 300 sq ft in Jackson, MS

Part of the jobLowMidpointHighShare
Materials$4,600$6,950$9,25044%
Labor$5,850$8,750$11,70056%
Permits and fees$45$90$1301%
Total$10,500$15,800$21,100100%

Why Jackson prices look the way they do

We price the labor side from BLS wage data for 2 trades: carpenters at 80%, construction laborers at 20%. Weighted together, Jackson wages are 0.81 times the national level. Labor makes up about 56% of the midpoint estimate (60% at national prices).

On the materials line, the BEA goods price index for the Jackson metro is 96.2 (US = 100). The midpoint materials bill for 300 sq ft comes to $6,950, compared with $7,200 at national prices. Permit and inspection fees are scaled by the broader index (89.0) and land at $45 to $130.

Why two Jackson quotes can differ

  • Drainage

    Ground-level decks over poorly draining yards may need $1,000-$4,000 of drainage work first.

  • Engineering

    Large or complex decks may need a structural engineer at $100-$220 an hour to get a permit.

  • Board grade

    Composite materials run $16-$32 per sq ft and the installed price is $40-$80 per sq ft, including the substructure (HomeGuide).

Jackson: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Jackson wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$10,500 to $14,700

Entry-level composite boards, low deck, simple shape

Standard

$13,700 to $17,900

Mid-grade capped boards with railing and stairs

Premium

$16,800 to $21,100

Premium capped or PVC boards, multi-level, hidden fasteners

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$4,250 – $5,950$5,500 – $7,200$6,800 – $8,500
12x12 (144 sq ft)$5,050 – $7,100$6,600 – $8,650$8,150 – $10,200
16x20 (320 sq ft)$11,200 – $15,700$14,600 – $19,100$18,000 – $22,500
20x20 (400 sq ft)$14,000 – $19,600$18,200 – $23,800$22,400 – $28,000

Optional extras in Jackson

Extras are quoted nationally and then scaled to Jackson by the average of the local wage index (0.81) and goods index (0.96), a factor of 0.89. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a deck railing (approx. 0.3 ft per sq ft)$1,600 – $4,800

When to schedule composite deck in Jackson

We use NOAA's 1991-2020 climate normals for Jackson Hawkins Fld (5 miles from the city center). These are 30-year monthly averages, not forecasts.

September through May is the stretch where exterior installation runs into the fewest weather problems in Jackson (9 of 12 months). June, July and August have an average daytime high of 90°F or more.

Jackson gets about 51 inches of precipitation in a normal year. The wettest months are January, March and April (5.3 inches in April). Inside the workable window, September and October are the driest, at 3.3 and 3.6 inches. The station averages about 83 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Jackson Hawkins Fld (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan57385.1Workable
Feb62414.4Workable
Mar70484.8Workable
Apr77555.3Workable
May84633.9Workable
Jun90713.9Hot
Jul92734.7Hot
Aug92733.4Hot
Sep88683.3Workable
Oct79563.6Workable
Nov67454.2Workable
Dec60404.7Workable

How Jackson compares

Of the five closest metros, 4 are cheaper than Jackson. Monroe is the lowest at about $15,400 (midpoint, 300 sq ft), 115 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Jackson, MSthis page$10,500 – $21,100$15,800
Hattiesburg, MS100 miles$10,400 – $20,700$15,600−2%
Monroe, LA115 miles$10,200 – $20,500$15,400−3%
Slidell, LA140 miles$10,300 – $20,700$15,500−2%
Tuscaloosa, AL145 miles$10,400 – $20,900$15,700−1%
Baton Rouge, LA145 miles$11,000 – $22,100$16,500+5%
Mississippi (statewide)$10,400 – $20,900$15,700−1%
United States$12,100 – $24,200$18,100+15%

Across 300 US metros, Jackson comes in at #243 from the top. The priciest is Honolulu, HI at $25,200; the cheapest is Brownsville, TX at $13,500 (midpoints, 300 sq ft). Statewide, Jackson is 1% above the Mississippi figure.

Other Mississippi metros

Mississippi metros compared with Jackson
MetroSizeRangeMidpointvs. here
Gulfport, MS158,310 jobs$10,600 – $21,200$15,900level
Hattiesburg, MS62,230 jobs$10,400 – $20,700$15,600−2%

Cities with a workforce like Jackson's

Big cities and small ones price differently, so here is Jackson against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Ogden, UT271,370 jobs$10,700 – $21,400$16,100+2%
Poughkeepsie, NY268,970 jobs$13,000 – $26,100$19,600+24%
Winston, NC271,980 jobs$10,700 – $21,500$16,100+2%
Chattanooga, TN268,750 jobs$10,800 – $21,700$16,200+3%

Related projects, priced for Jackson

Because every project leans on different trades, Jackson's wage level does not move all prices equally. Against the US midpoint, gutters runs −10% and paver patio −14%.

Related projects with local prices
ProjectSizeRangevs. US
Wood deck300 sq ft$6,750 – $13,600−10%
Concrete patio300 sq ft$1,150 – $3,450−13%
Paver patio300 sq ft$2,600 – $4,650−14%
Gutters160 linear ft$1,150 – $3,800−10%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Jackson is 0.81 times the national level.

For carpenters (47-2031, weighted 80%) the local median is $23.72 an hour, which is 19% below the national $29.12. The middle half of them earn between $20.46 and $25.17 an hour. BLS counts 660 of them working in the area, 24.4 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Construction laborers (47-2061), 20% of the weighting: a median of $18.20 an hour, 20% below the US median of $22.66. The middle half of them earn between $16.61 and $22.26 an hour. About 2,020 work in the metro. That is 74.6 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($25.17 an hour) instead of the median, the labor line grows by about $430. At the 25th percentile ($20.46) it shrinks by about $970. The total moves by 2.7% or 6.1%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 270,730 jobs in the Jackson area. That makes it the 96th largest of the 300 metros we cover, with 0.17% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$20.46$23.72$25.17$29.120.81metro
Construction laborers (47-2061)20%$16.61$18.20$22.26$22.660.80metro
Blended100%0.81

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $13,700 to $17,900 for Jackson, MS is attached.

Detailed composite deck report for Jackson, MS, $9

Multi-page report for Jackson, MS: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Composite deck in Jackson: your questions

+How much does it cost to build a composite deck in Jackson?

For 300 sq ft, expect $10,500 to $21,100 in the Jackson area. A standard-spec job lands at $13,700 to $17,900. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for composite deck in Jackson?

About $35 to $70 per sq ft for materials and labor, plus $45 to $130 for the permit if one is needed. The US range is $40 to $80.

+Is composite deck cheaper in Jackson or Hattiesburg?

Hattiesburg is 100 miles away. The midpoint for 300 sq ft there is $15,600, which is 2% less than Jackson ($15,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Jackson?

About 56% at the midpoint, or $8,750 out of $15,800. Materials are 44% and permits 1%. Nationally, labor is 60%.

+What would 16x20 (320 sq ft) cost in Jackson?

$11,200 to $22,500. Pick a different size in the estimator above to get your own number.

+Does composite deck need a permit in Jackson?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $130 for fees in the Jackson area (our national range of $50 to $150 scaled by the local price level).

+Is Jackson expensive for composite deck compared with the rest of Mississippi?

Jackson is 1% above the Mississippi statewide estimate ($15,700 at the midpoint). We cover 3 metros in Mississippi; see the state page to compare them.

+What do carpenters earn in Jackson?

The BLS median is $23.72 an hour in the Jackson area, compared with $29.12 nationally. The 25th to 75th percentile range is $20.46 to $25.17.

+What do basic and premium composite deck work cost in Jackson?

For 300 sq ft, basic work runs $10,500 to $14,700 and premium work $16,800 to $21,100. Basic means: entry-level composite boards, low deck, simple shape. Premium means: premium capped or PVC boards, multi-level, hidden fasteners.

+When is the best time to build a composite deck in Jackson?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are September through May. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a deck railing" add in Jackson?

$1,600 to $4,800 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Composite deck near Jackson

Composite deck: all pricesComposite deck in MississippiAll projects in JacksonMississippi cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.