Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$12,800 – $25,700
Per sq ft
$42.50 – $85
before permit
Versus US midpoint
+6%
US $18,100
Rank of 300 metros
#49
1 = most expensive

Fresno homeowners pay roughly $12,800 to $25,700 to build a composite deck at 300 sq ft, or $42.50 to $85 per sq ft (permit not included). Against the US midpoint, Fresno is 6% higher. Carpenters earn a median of $30.52 an hour in the Fresno area, 5% above the US median of $29.12.

Estimate your composite deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade capped boards with railing and stairs

Add-ons

Estimated cost for 300 sq ft in Fresno, CA, standard level

$16,700 to $21,800

About $55.50 to $72.50 per sq ft before permits. Labor is about 60% of the bill.

Cost breakdown
PartLowHigh
Materials$6,550$8,600
Labor$10,000$13,100
Permits and fees$80$120
Total$16,700$21,800
Save and get a PDF report

Cost breakdown for 300 sq ft in Fresno, CA

Part of the jobLowMidpointHighShare
Materials$5,050$7,550$10,10039%
Labor$7,700$11,600$15,40060%
Permits and fees$50$100$1501%
Total$12,800$19,300$25,700100%

Where the Fresno price comes from

The wage side of the estimate leans on carpenters, who do 80% of the hours on a typical job. Their local median is $30.52 an hour. Add the other trades involved and the blended wage index for Fresno is 1.07 (US = 1.00), which puts labor at 60% of the total.

On the materials line, the BEA goods price index for the Fresno metro is 105.2 (US = 100). The midpoint materials bill for 300 sq ft comes to $7,550, compared with $7,200 at national prices. Permit and inspection fees are scaled by the broader index (102.2) and land at $50 to $150.

Fresno against nearby metros and the rest of California

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $19,000 to $22,300 across Fresno and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Fresno, CAthis page$12,800 – $25,700$19,300
Merced, CA60 miles$13,900 – $27,800$20,800+8%
Visalia, CA65 miles$12,700 – $25,400$19,000−1%
Modesto, CA85 miles$14,000 – $28,000$21,000+9%
San Jose, CA95 miles$14,800 – $29,700$22,300+16%
Salinas, CA100 miles$13,400 – $26,900$20,100+5%
California (statewide)$14,200 – $28,500$21,300+11%
United States$12,100 – $24,200$18,100−6%

Across 300 US metros, Fresno comes in at #49 from the top. The priciest is Honolulu, HI at $25,200; the cheapest is Brownsville, TX at $13,500 (midpoints, 300 sq ft). Statewide, Fresno is 10% below the California figure.

Other California metros

California metros compared with Fresno
MetroSizeRangeMidpointvs. here
Los Angeles, CA6,271,560 jobs$14,200 – $28,400$21,300+11%
San Francisco, CA2,373,920 jobs$16,000 – $32,000$24,000+25%
Riverside, CA1,716,760 jobs$13,500 – $27,000$20,200+5%
San Diego, CA1,538,060 jobs$13,900 – $27,900$20,900+9%
San Jose, CA1,134,970 jobs$14,800 – $29,700$22,300+16%
Sacramento, CA1,080,590 jobs$14,000 – $28,100$21,100+9%

Cities with a workforce like Fresno's

Big cities and small ones price differently, so here is Fresno against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Rochester, NY494,280 jobs$12,000 – $24,000$18,000−6%
Tulsa, OK458,730 jobs$10,300 – $20,700$15,500−20%
Omaha, NE498,100 jobs$11,100 – $22,200$16,600−14%
Albany, NY449,410 jobs$12,200 – $24,500$18,400−5%

Pick a size, pick a tier: composite deck pricing in Fresno

Three bands are cut from the same cited range and localized for Fresno wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$12,800 to $18,000

Entry-level composite boards, low deck, simple shape

Standard

$16,700 to $21,800

Mid-grade capped boards with railing and stairs

Premium

$20,500 to $25,700

Premium capped or PVC boards, multi-level, hidden fasteners

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$5,150 – $7,250$6,700 – $8,800$8,300 – $10,400
12x12 (144 sq ft)$6,200 – $8,650$8,050 – $10,500$9,900 – $12,400
16x20 (320 sq ft)$13,700 – $19,200$17,800 – $23,300$21,900 – $27,400
20x20 (400 sq ft)$17,100 – $23,900$22,200 – $29,100$27,400 – $34,200

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 2 trades carry the job here, and each is compared with its US median. The weighted result for Fresno is 1.07 times the national level.

For carpenters (47-2031, weighted 80%) the local median is $30.52 an hour, which is 5% above the national $29.12. The middle half of them earn between $23.62 and $39.23 an hour. BLS counts 1,790 of them working in the area, 37.5 for every 10,000 jobs (US: 43.1), so the local bench is about average.

Construction laborers (47-2061), 20% of the weighting: a median of $26.50 an hour, 17% above the US median of $22.66. The middle half of them earn between $22.16 and $36.70 an hour. About 2,660 work in the metro. That is 55.8 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

Quotes come from real crews, not medians. If the carpenters on your job are paid at the 75th percentile ($39.23 an hour) instead of the median, the labor line grows by about $2,600. At the 25th percentile ($23.62) it shrinks by about $2,050. The total moves by 13.4% or 10.6%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 476,890 jobs in the Fresno area. That makes it the 53rd largest of the 300 metros we cover, with 0.31% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$23.62$30.52$39.23$29.121.05metro
Construction laborers (47-2061)20%$22.16$26.50$36.70$22.661.17metro
Blended100%1.07

Composite deck: what moves the price in Fresno

  • Drainage

    Ground-level decks over poorly draining yards may need $1,000-$4,000 of drainage work first.

  • Engineering

    Large or complex decks may need a structural engineer at $100-$220 an hour to get a permit.

  • Board grade

    Composite materials run $16-$32 per sq ft and the installed price is $40-$80 per sq ft, including the substructure (HomeGuide).

What nearby projects cost in Fresno

Because every project leans on different trades, Fresno's wage level does not move all prices equally. Against the US midpoint, paver patio runs +10% and wood deck +6%.

Related projects with local prices
ProjectSizeRangevs. US
Wood deck300 sq ft$8,000 – $16,100+6%
Concrete patio300 sq ft$1,350 – $4,300+7%
Paver patio300 sq ft$3,300 – $5,950+10%
Gutters160 linear ft$1,400 – $4,600+9%

When to schedule composite deck in Fresno

We use NOAA's 1991-2020 climate normals for Fresno Yosemite Intl Ap (5 miles from the city center). These are 30-year monthly averages, not forecasts.

October through May is the stretch where exterior installation runs into the fewest weather problems in Fresno (8 of 12 months). June, July, August and September have an average daytime high of 90°F or more.

Fresno gets about 11 inches of precipitation in a normal year. The wettest months are January, February and March (2.2 inches in January). Inside the workable window, May and October are the driest, at 0.4 and 0.6 inches. The station averages about 113 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Fresno Yosemite Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan55412.2Workable
Feb61431.9Workable
Mar68471.9Workable
Apr74511.0Workable
May83580.4Workable
Jun91640.2Hot
Jul98690.0Hot
Aug97680.0Hot
Sep91630.1Hot
Oct79550.6Workable
Nov65450.9Workable
Dec55401.8Workable

Add-ons priced for Fresno

Extras are quoted nationally and then scaled to Fresno by the average of the local wage index (1.07) and goods index (1.05), a factor of 1.06. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a deck railing (approx. 0.3 ft per sq ft)$1,900 – $5,750

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $16,700 to $21,800 for Fresno, CA is attached.

Detailed composite deck report for Fresno, CA, $9

Multi-page report for Fresno, CA: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Composite deck in Fresno: your questions

+How much does it cost to build a composite deck in Fresno?

For 300 sq ft, expect $12,800 to $25,700 in the Fresno area. A standard-spec job lands at $16,700 to $21,800. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for composite deck in Fresno?

About $42.50 to $85 per sq ft for materials and labor, plus $50 to $150 for the permit if one is needed. The US range is $40 to $80.

+Is composite deck cheaper in Fresno or Merced?

Merced is 60 miles away. The midpoint for 300 sq ft there is $20,800, which is 8% more than Fresno ($19,300). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Fresno?

About 60% at the midpoint, or $11,600 out of $19,300. Materials are 39% and permits 1%. Nationally, labor is 60%.

+What would 16x20 (320 sq ft) cost in Fresno?

$13,700 to $27,400. Pick a different size in the estimator above to get your own number.

+Does composite deck need a permit in Fresno?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $150 for fees in the Fresno area (our national range of $50 to $150 scaled by the local price level).

+Is Fresno expensive for composite deck compared with the rest of California?

Fresno is 10% below the California statewide estimate ($21,300 at the midpoint). We cover 23 metros in California; see the state page to compare them.

+What do carpenters earn in Fresno?

The BLS median is $30.52 an hour in the Fresno area, compared with $29.12 nationally. The 25th to 75th percentile range is $23.62 to $39.23.

+What do basic and premium composite deck work cost in Fresno?

For 300 sq ft, basic work runs $12,800 to $18,000 and premium work $20,500 to $25,700. Basic means: entry-level composite boards, low deck, simple shape. Premium means: premium capped or PVC boards, multi-level, hidden fasteners.

+When is the best time to build a composite deck in Fresno?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through May. May and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a deck railing" add in Fresno?

$1,900 to $5,750 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Composite deck near Fresno

Composite deck: all pricesComposite deck in CaliforniaAll projects in FresnoCalifornia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.