Bathroom remodel cost in Logan, UT
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (45 sq ft)
- $4,350 – $21,400
- Per sq ft
- $92 – $459
- before permit
- Versus US midpoint
- −8%
- US $14,000
- Rank of 300 metros
- #192
- 1 = most expensive
A bathroom remodel in Logan, UT usually costs $4,350 to $21,400 for 45 sq ft. That works out to about $92 to $459 per sq ft before permits. Compared with the national midpoint that is $1,100 less. Plumbers, pipefitters and steamfitters earn a median of $29.03 an hour in the Logan area, 5% below the US median of $30.67.
Estimate your bathroom remodel cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 45 sq ft in Logan, UT, standard level
$9,450 to $16,300
About $202 to $349 per sq ft before permits. Labor is about 51% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $4,300 | $7,400 |
| Labor | $4,800 | $8,300 |
| Permits and fees | $360 | $590 |
| Total | $9,450 | $16,300 |
Cost breakdown for 45 sq ft in Logan, UT
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,950 | $5,850 | $9,750 | 45% |
| Labor | $2,200 | $6,550 | $10,900 | 51% |
| Permits and fees | $190 | $480 | $770 | 4% |
| Total | $4,350 | $12,900 | $21,400 | 100% |
What is behind the Logan number
The wage side of the estimate leans on plumbers, pipefitters and steamfitters, who do 25% of the hours on a typical job. Their local median is $29.03 an hour. Add the other trades involved and the blended wage index for Logan is 0.88 (US = 1.00), which puts labor at 51% of the total.
Materials are scaled with BEA's regional price parity for goods. Logan is at 96.4 against 100 for the US, so a materials line of $6,100 nationally becomes $5,850 here (midpoint, 45 sq ft). Permits follow the all-items index of 95.9: $190 to $770.
Data note: 25% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Logan. The wage table below marks each row.
Planning more than one job in Logan?
Jobs that often go together with bathroom remodel are priced below at their usual sizes, using the same Logan wage and price inputs. Compared with national midpoints, kitchen remodel comes out highest (−6%) and kitchen cabinets lowest (−9%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Shower pan | 1 pan | $860 – $2,650 | −6% |
| Kitchen remodel | 120 sq ft | $17,500 – $29,700 | −6% |
| Kitchen cabinets | 25 linear ft | $3,950 – $12,600 | −9% |
| Window replacement | 10 windows | $4,200 – $14,100 | −6% |
| Kitchen backsplash | 30 sq ft | $280 – $1,400 | −7% |
How Logan compares
Same job, same size (45 sq ft), priced for the nearest metros. Salt Lake City is the priciest of the group at $13,500. Idaho Falls is the cheapest at $12,400.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Logan, UTthis page | $4,350 – $21,400 | $12,900 | |
| Ogden, UT55 miles | $4,400 – $21,900 | $13,100 | +2% |
| Salt Lake City, UT110 miles | $4,550 – $22,500 | $13,500 | +5% |
| Idaho Falls, ID125 miles | $4,150 – $20,600 | $12,400 | −4% |
| Provo, UT145 miles | $4,400 – $21,700 | $13,100 | +1% |
| Boise, ID235 miles | $4,300 – $21,400 | $12,900 | level |
| Utah (statewide) | $4,400 – $21,900 | $13,100 | +2% |
| United States | $4,700 – $23,300 | $14,000 | +9% |
Out of the 300 metros we cover, Logan ranks #192 for the cost of this job (#1 is the most expensive). Statewide, Logan is 2% below the Utah figure.
Elsewhere in Utah
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Salt Lake City, UT | 826,210 jobs | $4,550 – $22,500 | $13,500 | +5% |
| Provo, UT | 304,660 jobs | $4,400 – $21,700 | $13,100 | +1% |
| Ogden, UT | 271,370 jobs | $4,400 – $21,900 | $13,100 | +2% |
| St. George, UT | 90,500 jobs | $4,250 – $21,000 | $12,600 | −2% |
Metros of a similar size
Big cities and small ones price differently, so here is Logan against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Missoula, MT | 67,070 jobs | $4,850 – $24,000 | $14,400 | +12% |
| Flagstaff, AZ | 66,610 jobs | $4,450 – $22,000 | $13,200 | +3% |
| Grand Junction, CO | 67,170 jobs | $4,600 – $22,700 | $13,600 | +6% |
| Amherst, MA | 65,670 jobs | $5,250 – $26,000 | $15,600 | +21% |
Why two Logan quotes can differ
Contractor fee
A general contractor charges $50-$150 an hour or 10-20% of the project cost.
Permit
A bathroom remodel permit is $200-$800, more if you move walls (HomeGuide).
Size
HomeGuide's average-size bathroom comes to $3,500-$25,000+; per square foot it's $100-$500.
Pick a size, pick a tier: bathroom remodel pricing in Logan
The cited range is split into basic, standard and premium bands, then scaled to Logan. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from half bath (20 sq ft) to primary bath (100 sq ft).
Basic
$4,350 to $11,200
Cosmetic refresh: vanity, fixtures, paint, flooring
Standard
$9,450 to $16,300
Full remodel with new tub or shower and tile
Premium
$14,600 to $21,400
Primary bath, custom tile, layout change
| Size | Basic | Standard | Premium |
|---|---|---|---|
| half bath (20 sq ft) | $2,050 – $5,200 | $4,400 – $7,600 | $6,800 – $9,950 |
| small full bath (40 sq ft) | $3,850 – $10,000 | $8,450 – $14,600 | $13,000 – $19,100 |
| average bath (60 sq ft) | $5,700 – $14,800 | $12,500 – $21,500 | $19,300 – $28,300 |
| primary bath (100 sq ft) | $9,400 – $24,300 | $20,600 – $35,500 | $31,800 – $46,700 |
What local crews earn in Logan
The labor line is built from BLS wage data, one trade at a time. This job draws on 6 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Logan the blend is 0.88.
Plumbers, pipefitters and steamfitters (47-2152), 25% of the weighting: a median of $29.03 an hour, 5% below the US median of $30.67. The middle half of them earn between $22.30 and $35.92 an hour. About 170 work in the metro. That is 25.4 per 10,000 jobs, compared with 30.0 nationally, so expect fewer local crews to bid.
Tile and stone setters (47-2044) carry 25% of the labor weighting. BLS does not publish this trade for the Logan metro, so we used the Utah statewide median: $23.72 an hour against $26.77 for the US. The middle half of them earn between $21.08 and $28.45 an hour.
Carpenters (47-2031), 20% of the weighting: a median of $23.86 an hour, 18% below the US median of $29.12. The middle half of them earn between $19.08 and $29.12 an hour. About 490 work in the metro. That is 73.4 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.
For electricians (47-2111, weighted 10%) the local median is $27.92 an hour, which is 8% below the national $30.38. The middle half of them earn between $22.51 and $36.59 an hour. BLS counts 350 of them working in the area, 52.4 for every 10,000 jobs (US: 48.7), so the local bench is about average.
For drywall and ceiling tile installers (47-2081, weighted 10%) the local median is $23.51 an hour, which is 17% below the national $28.33. The middle half of them earn between $20.28 and $27.42 an hour. BLS counts 160 of them working in the area, 24.0 for every 10,000 jobs (US: 5.3), so the local bench is deeper than average.
Painters, construction and maintenance (47-2141), 10% of the weighting: a median of $20.19 an hour, 15% below the US median of $23.75. The middle half of them earn between $17.70 and $22.66 an hour. About 120 work in the metro. That is 18.0 per 10,000 jobs, compared with 14.5 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (plumbers, pipefitters and steamfitters) from the median to the 75th percentile wage adds about $420 to the midpoint estimate; the 25th percentile takes off about $410. That is a swing of roughly 3.2% to 3.2% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Logan has 66,800 jobs in total (BLS, May 2025), ranking 271st by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Plumbers, pipefitters and steamfitters (47-2152) | 25% | $22.30 | $29.03 | $35.92 | $30.67 | 0.95 | metro |
| Tile and stone setters (47-2044) | 25% | $21.08 | $23.72 | $28.45 | $26.77 | 0.89 | state |
| Carpenters (47-2031) | 20% | $19.08 | $23.86 | $29.12 | $29.12 | 0.82 | metro |
| Electricians (47-2111) | 10% | $22.51 | $27.92 | $36.59 | $30.38 | 0.92 | metro |
| Drywall and ceiling tile installers (47-2081) | 10% | $20.28 | $23.51 | $27.42 | $28.33 | 0.83 | metro |
| Painters, construction and maintenance (47-2141) | 10% | $17.70 | $20.19 | $22.66 | $23.75 | 0.85 | metro |
| Blended | 100% | 0.88 | |||||
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $9,450 to $16,300 for Logan, UT is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Logan, UT: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Bathroom remodel in Logan: your questions
+How much does it cost to remodel a bathroom in Logan?
For 45 sq ft, expect $4,350 to $21,400 in the Logan area. A standard-spec job lands at $9,450 to $16,300. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for bathroom remodel in Logan?
About $92 to $459 per sq ft for materials and labor, plus $190 to $770 for the permit if one is needed. The US range is $100 to $500.
+Is bathroom remodel cheaper in Logan or Ogden?
Ogden is 55 miles away. The midpoint for 45 sq ft there is $13,100, which is 2% more than Logan ($12,900). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Logan?
About 51% at the midpoint, or $6,550 out of $12,900. Materials are 45% and permits 4%. Nationally, labor is 53%.
+What would average bath (60 sq ft) cost in Logan?
$5,700 to $28,300. Pick a different size in the estimator above to get your own number.
+Does bathroom remodel need a permit in Logan?
Often, but rules are set by your city or county building office, so call before you hire. Budget $190 to $770 for fees in the Logan area (our national range of $200 to $800 scaled by the local price level).
+Is Logan expensive for bathroom remodel compared with the rest of Utah?
Logan is 2% below the Utah statewide estimate ($13,100 at the midpoint). We cover 5 metros in Utah; see the state page to compare them.
+What do plumbers, pipefitters and steamfitters earn in Logan?
The BLS median is $29.03 an hour in the Logan area, compared with $30.67 nationally. The 25th to 75th percentile range is $22.30 to $35.92.
+What do basic and premium bathroom remodel work cost in Logan?
For 45 sq ft, basic work runs $4,350 to $11,200 and premium work $14,600 to $21,400. Basic means: cosmetic refresh: vanity, fixtures, paint, flooring. Premium means: primary bath, custom tile, layout change.
Bathroom remodel near Logan
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Bathroom Remodel Cost? (2026) (accessed November 4, 2026)
- Cost to Renovate: Renovation Labor Report 2026: Where the Money Goes (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
Note on derived figures: Materials = 45% of the installed price, from Cost to Renovate's mid-range split for bathroom projects (50% labor, 45% materials, 5% permits and design). Their sample is their own guides, not a survey of contractors, so treat the split as approximate.