Kitchen backsplash cost in Ohio
Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.
- Statewide range (30 sq ft)
- $270 – $1,350
- Per sq ft
- $8.90 – $45
- before permit
- Versus US midpoint
- −10%
- US $900
- Metros covered
- 8
Ohio prices for kitchen backsplash: $270 to $1,350 for 30 sq ft, or $8.90 to $45 per sq ft without the permit. The state midpoint is 10% below the national one. Local wages for tile and stone setters are $22.18 an hour.
Inside Ohio, the metros we cover range from $790 (Youngstown) to $830 (Cleveland) at the midpoint. Pick your closest city in the table for a tighter number.
Estimate your kitchen backsplash cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 30 sq ft in Ohio (statewide), standard level
$590 to $1,050
About $19.50 to $34 per sq ft before permits. Labor is about 39% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $350 | $630 |
| Labor | $240 | $390 |
| Permits and fees | $0 | $0 |
| Total | $590 | $1,050 |
Cost breakdown for 30 sq ft in Ohio
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $140 | $490 | $840 | 61% |
| Labor | $130 | $320 | $510 | 39% |
| Permits and fees | $0 | $0 | $0 | 0% |
| Total | $270 | $810 | $1,350 | 100% |
Quality levels and sizes in Ohio
The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Ohio wages and prices. The grid prices the same bands at 3 common sizes.
Basic
$270 to $700
Basic ceramic subway tile
Standard
$590 to $1,050
Mid-grade tile in a pattern
Premium
$920 to $1,350
Slab or natural stone
| Size | Basic | Standard | Premium |
|---|---|---|---|
| small kitchen (25 sq ft) | $220 – $580 | $490 – $850 | $760 – $1,150 |
| average kitchen (30 sq ft) | $270 – $700 | $590 – $1,050 | $920 – $1,350 |
| full-height (50 sq ft) | $450 – $1,150 | $990 – $1,700 | $1,550 – $2,250 |
Kitchen backsplash: what moves the price in Ohio
Material
A tile backsplash is $10-$50 per sq ft installed. A stone slab backsplash is $35-$200 and granite slabs are $50-$200.
Labor and minimums
Tile labor is $8-$20 per sq ft and many installers charge minimums for small areas.
Old backsplash removal
Removing the old one adds $2-$5 per sq ft.
Part of a remodel
A backsplash often gets bundled into a kitchen remodel and priced with it.
Ohio labor market for kitchen backsplash
Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 2 trades drive the labor line for this job, and the weighted ratio against the national wage level is 0.85 for Ohio.
For tile and stone setters (47-2044, weighted 90%) the local median is $22.18 an hour, which is 17% below the national $26.77. The middle half of them earn between $20.03 and $28.15 an hour. BLS counts 670 of them working in the state, 1.2 for every 10,000 jobs (US: 2.3), so the local bench is thinner than average.
For carpenters (47-2031, weighted 10%) the local median is $29.24 an hour, which is in line with the national $29.12. The middle half of them earn between $23.42 and $36.47 an hour. BLS counts 18,450 of them working in the state, 33.2 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.
A crew paid at the 75th percentile for tile and stone setters ($28.15 an hour) would add about $75 to the statewide midpoint; one at the 25th percentile ($20.03) would take off about $25. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.
BLS counts 5,550,180 jobs across Ohio (May 2025), which is 3.6% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Tile and stone setters (47-2044) | 90% | $20.03 | $22.18 | $28.15 | $26.77 | 0.83 | state |
| Carpenters (47-2031) | 10% | $23.42 | $29.24 | $36.47 | $29.12 | 1.00 | state |
| Blended | 100% | 0.85 | |||||
Kitchen backsplash cost by metro in Ohio
2 of the 8 metros sit above the statewide midpoint of $810, and the top-to-bottom gap is 6%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.
| Metro | Range (30 sq ft) | Midpoint | vs. state |
|---|---|---|---|
| Cleveland, OH | $280 – $1,400 | $830 | +3% |
| Columbus, OH | $270 – $1,350 | $820 | +1% |
| Akron, OH | $270 – $1,350 | $810 | level |
| Cincinnati, OH | $270 – $1,350 | $810 | level |
| Dayton, OH | $270 – $1,350 | $810 | level |
| Canton, OH | $270 – $1,350 | $810 | level |
| Toledo, OH | $260 – $1,350 | $800 | −1% |
| Youngstown, OH | $260 – $1,300 | $790 | −3% |
Related projects, priced for Ohio
The table prices neighboring jobs at their usual sizes using statewide Ohio wages and prices. Against national midpoints, kitchen cabinets comes out highest (−3%) and tile flooring lowest (−9%), because each job leans on different trades.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Kitchen remodel | 120 sq ft | $17,500 – $29,800 | −5% |
| Kitchen cabinets | 25 linear ft | $4,050 – $13,600 | −3% |
| Tile flooring | 200 sq ft | $2,150 – $9,200 | −9% |
| Bathroom remodel | 45 sq ft | $4,450 – $22,100 | −5% |
| Shower pan | 1 pan | $850 – $2,600 | −8% |
How Ohio compares with nearby states
Ohio ranks 42 of 51 (the 50 states plus DC) for kitchen backsplash, where 1 is the most expensive. The costliest is Hawaii at $1,100 and the cheapest Arkansas at $760, both for 30 sq ft at the midpoint. Ohio sits at $810. The five states closest by workforce center are listed below.
| State | Distance | Range | Midpoint | vs. here |
|---|---|---|---|---|
| West Virginia | 130 miles away | $280 – $1,400 | $850 | +5% |
| Michigan | 180 miles away | $280 – $1,400 | $830 | +3% |
| Indiana | 180 miles away | $280 – $1,400 | $830 | +3% |
| Kentucky | 210 miles away | $270 – $1,400 | $820 | +2% |
| Illinois | 280 miles away | $340 – $1,650 | $1,000 | +24% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $590 to $1,050 for Ohio is attached.
Detailed kitchen backsplash report for Ohio, $9
Multi-page report for Ohio: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Kitchen backsplash in Ohio: your questions
+How much does it cost to install a backsplash in Ohio?
$270 to $1,350 for 30 sq ft, using statewide wages and prices. Metro areas inside Ohio can sit above or below that.
+Which city in Ohio is cheapest for kitchen backsplash?
Youngstown at about $790 (midpoint, 30 sq ft). The priciest is Cleveland at $830.
+Is kitchen backsplash cheaper in Ohio than the US average?
It is 10% cheaper: $810 against $900 for 30 sq ft at the midpoint.
+What share of the price is labor in Ohio?
About 39% ($320). Materials are 61%. Statewide labor for this job is weighted 0.85x the national wage level.
+What do tile and stone setters earn in Ohio?
The BLS statewide median is $22.18 an hour, against $26.77 for the US. The 25th to 75th percentile range is $20.03 to $28.15.
+Where does Ohio rank for kitchen backsplash costs?
42nd most expensive of 51 (the 50 states plus DC) at the midpoint, $810 for 30 sq ft. Rank 1 is the costliest.
+What do basic and premium kitchen backsplash work cost in Ohio?
For 30 sq ft, basic work runs $270 to $700 and premium work $920 to $1,350. Basic means: basic ceramic subway tile. Premium means: slab or natural stone.
Kitchen backsplash by city in Ohio
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: 2026 Backsplash Installation Cost (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
Note on derived figures: Materials = installed price minus HomeGuide's $5-$20 per sq ft labor figure, matched low-to-low and high-to-high.